TurbinePayback

Wind Turbine Payback in Greenlee County, AZ

Wind turbine payback in Greenlee County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Greenlee County, AZ averages 4.17 m/s (9.3 mph). A 10 kW turbine there would make about 7,461 kWh a year, worth $1,146 at AZ's 15.36¢/kWh. Against an installed cost of about $100,000, that is a payback of 87 years, and the turbine is built to last about 20.

What to do in Greenlee County

A home turbine is not worth buying for savings in Greenlee County unless your spot is far windier than the county average, 7.8 m/s at the hub against 4.17 m/s here. Per kW, solar panels would make about 1,629 kWh a year here against the turbine's 746, so get a solar quote first.

What would have to change

Against the rest of AZ

Greenlee County is the 1,965th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in AZ is Apache County at 5.25 m/s, payback 46 years.

Month by month in Greenlee County

April is the strongest month here, at 4.92 m/s and about 988 kWh. August is the weakest, 3.47 m/s and 358 kWh, so the best month makes 2.8 times the worst. November to March brings in 39% of the year's output in Greenlee County.

MonthWind at 30 mOutputWorth
January3.87 m/s503 kWh$77
February4.17 m/s573 kWh$88
March4.52 m/s804 kWh$123
April4.92 m/s988 kWh$152
May4.75 m/s927 kWh$142
June4.58 m/s809 kWh$124
July3.78 m/s471 kWh$72
August3.47 m/s358 kWh$55
September3.96 m/s522 kWh$80
October4.12 m/s610 kWh$94
November4.13 m/s598 kWh$92
December3.84 m/s492 kWh$76

What a taller tower would buy

Measured at 10 m the wind in Greenlee County averages 3.3 m/s; at 50 m it is 4.65 m/s. That gives a shear exponent of 0.213, typical of ordinary open country. Going from 20 m to 50 m takes output from 5,733 to 10,257 kWh a year, 79% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.83 m/s5,733 kWhover 100 years
30 m4.17 m/s7,465 kWh87 years
40 m4.43 m/s8,948 kWh73 years
50 m4.65 m/s10,257 kWh64 years

Counties around Greenlee County

4 of the 6 closest counties are windier at turbine height; the windiest, Grant County, averages 5.52 m/s.

Sun versus wind in Greenlee County

Greenlee County gets 5.58 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,629 kWh a year; one kW of the turbine above makes 746. Kilowatt for kilowatt, panels make 2.2 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.