TurbinePayback

Wind Turbine Payback in Grant County, NM

Wind turbine payback in Grant County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Grant County, NM averages 5.52 m/s (12.3 mph). A 10 kW turbine there would make about 16,181 kWh a year, worth $2,482 at NM's 15.34¢/kWh. Against an installed cost of about $100,000, that is a payback of 40 years, and the turbine is built to last about 20.

What to do in Grant County

A home turbine is not worth buying for savings in Grant County unless your spot is far windier than the county average, 7.8 m/s at the hub against 5.52 m/s here. Per kW, solar panels would make about 1,699 kWh a year here against the turbine's 1,618, so get a solar quote first.

What would have to change

Against the rest of NM

Grant County is the 1,207th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NM is Union County at 6.75 m/s, payback 26 years.

Month by month in Grant County

April is the strongest month here, at 6.84 m/s and about 2,126 kWh. August is the weakest, 4.23 m/s and 663 kWh, so the best month makes 3.2 times the worst. November to March brings in 44% of the year's output in Grant County.

MonthWind at 30 mOutputWorth
January5.37 m/s1,281 kWh$197
February5.91 m/s1,461 kWh$224
March6.27 m/s1,841 kWh$282
April6.84 m/s2,126 kWh$326
May6.42 m/s1,937 kWh$297
June5.82 m/s1,511 kWh$232
July4.52 m/s803 kWh$123
August4.23 m/s663 kWh$102
September4.80 m/s919 kWh$141
October5.27 m/s1,222 kWh$187
November5.44 m/s1,281 kWh$197
December5.39 m/s1,297 kWh$199

What a taller tower would buy

Measured at 10 m the wind in Grant County averages 4.31 m/s; at 50 m it is 6.19 m/s. That gives a shear exponent of 0.225, typical of ordinary open country. Going from 20 m to 50 m takes output from 12,784 to 21,113 kWh a year, 65% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.04 m/s12,784 kWh51 years
30 m5.52 m/s16,166 kWh40 years
40 m5.89 m/s18,867 kWh35 years
50 m6.19 m/s21,113 kWh31 years

Counties around Grant County

None of the 6 closest counties is windier than Grant County.

Sun versus wind in Grant County

Grant County gets 5.82 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,699 kWh a year; one kW of the turbine above makes 1,618. Kilowatt for kilowatt, panels make 1.1 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.