Wind turbine payback in Harding County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Harding County, SD averages 6.62 m/s (14.8 mph). A 10 kW turbine there would make about 24,289 kWh a year, worth $3,541 at SD's 14.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 28 years, and the turbine is built to last about 20.

What to do in Harding County

A home turbine is not worth buying for savings in Harding County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.62 m/s here. Per kW, solar panels would make about 1,229 kWh a year here against the turbine's 2,429, so get a solar quote first.

What would have to change

Against the rest of SD

Harding County is the 102nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in SD is Todd County at 6.77 m/s, payback 27 years.

Month by month in Harding County

January is the strongest month here, at 7.50 m/s and about 2,594 kWh. July is the weakest, 5.56 m/s and 1,400 kWh, so the best month makes 1.9 times the worst. November to March brings in 48% of the year's output in Harding County.

MonthWind at 30 mOutputWorth
January7.50 m/s2,594 kWh$378
February6.81 m/s1,968 kWh$287
March6.86 m/s2,212 kWh$323
April6.73 m/s2,060 kWh$300
May6.52 m/s1,999 kWh$291
June6.07 m/s1,660 kWh$242
July5.56 m/s1,400 kWh$204
August5.72 m/s1,495 kWh$218
September6.27 m/s1,787 kWh$261
October7.03 m/s2,316 kWh$338
November7.11 m/s2,289 kWh$334
December7.25 m/s2,446 kWh$357

What a taller tower would buy

Measured at 10 m the wind in Harding County averages 5.29 m/s; at 50 m it is 7.34 m/s. That gives a shear exponent of 0.203, typical of ordinary open country. Going from 20 m to 50 m takes output from 20,402 to 29,437 kWh a year, 44% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6.09 m/s20,402 kWh34 years
30 m6.62 m/s24,267 kWh28 years
40 m7.01 m/s27,150 kWh25 years
50 m7.34 m/s29,437 kWh23 years

Counties around Harding County

3 of the 6 closest counties are windier at turbine height; the windiest, Bowman County, averages 6.79 m/s.

Sun versus wind in Harding County

Harding County gets 4.21 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,229 kWh a year; one kW of the turbine above makes 2,429. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.