Wind turbine payback in Adams County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Adams County, ND averages 6.73 m/s (15.1 mph). A 10 kW turbine there would make about 25,093 kWh a year, worth $3,127 at ND's 12.46¢/kWh. Against an installed cost of about $100,000, that is a payback of 32 years, and the turbine is built to last about 20.

What to do in Adams County

A home turbine is not worth buying for savings in Adams County unless your spot is far windier than the county average, 9.1 m/s at the hub against 6.73 m/s here. Per kW, solar panels would make about 1,194 kWh a year here against the turbine's 2,509, so get a solar quote first.

What would have to change

Against the rest of ND

Adams County is the 46th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ND is Bowman County at 6.79 m/s, payback 31 years.

Month by month in Adams County

January is the strongest month here, at 7.33 m/s and about 2,497 kWh. July is the weakest, 5.81 m/s and 1,555 kWh, so the best month makes 1.6 times the worst. November to March brings in 46% of the year's output in Adams County.

MonthWind at 30 mOutputWorth
January7.33 m/s2,497 kWh$311
February6.72 m/s1,920 kWh$239
March6.99 m/s2,292 kWh$286
April6.95 m/s2,191 kWh$273
May6.70 m/s2,115 kWh$264
June6.24 m/s1,768 kWh$220
July5.81 m/s1,555 kWh$194
August5.95 m/s1,640 kWh$204
September6.55 m/s1,954 kWh$243
October7.20 m/s2,417 kWh$301
November7.12 m/s2,292 kWh$286
December7.15 m/s2,390 kWh$298

What a taller tower would buy

Measured at 10 m the wind in Adams County averages 5.38 m/s; at 50 m it is 7.47 m/s. That gives a shear exponent of 0.204, typical of ordinary open country. Going from 20 m to 50 m takes output from 21,161 to 30,331 kWh a year, 43% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6.2 m/s21,161 kWh38 years
30 m6.73 m/s25,099 kWh32 years
40 m7.14 m/s28,021 kWh29 years
50 m7.47 m/s30,331 kWh27 years

Counties around Adams County

3 of the 6 closest counties are windier at turbine height; the windiest, Bowman County, averages 6.79 m/s.

Sun versus wind in Adams County

Adams County gets 4.09 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,194 kWh a year; one kW of the turbine above makes 2,509. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.1 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.