TurbinePayback

Wind Turbine Payback in Hooker County, NE

Wind turbine payback in Hooker County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Hooker County, NE averages 6.82 m/s (15.3 mph). A 10 kW turbine there would make about 25,747 kWh a year, worth $3,327 at NE's 12.92¢/kWh. Against an installed cost of about $100,000, that is a payback of 30 years, and the turbine is built to last about 20.

What to do in Hooker County

A home turbine is not worth buying for savings in Hooker County unless your spot is far windier than the county average, 8.8 m/s at the hub against 6.82 m/s here. Per kW, solar panels would make about 1,340 kWh a year here against the turbine's 2,575, so get a solar quote first.

What would have to change

Against the rest of NE

Hooker County is the 30th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NE is Cherry County at 6.83 m/s, payback 30 years.

Month by month in Hooker County

January is the strongest month here, at 7.52 m/s and about 2,606 kWh. July is the weakest, 5.69 m/s and 1,482 kWh, so the best month makes 1.8 times the worst. November to March brings in 47% of the year's output in Hooker County.

MonthWind at 30 mOutputWorth
January7.52 m/s2,606 kWh$337
February7.23 m/s2,201 kWh$284
March7.20 m/s2,416 kWh$312
April7.34 m/s2,420 kWh$313
May6.68 m/s2,103 kWh$272
June6.14 m/s1,708 kWh$221
July5.69 m/s1,482 kWh$191
August5.76 m/s1,522 kWh$197
September6.53 m/s1,943 kWh$251
October7.09 m/s2,351 kWh$304
November7.30 m/s2,395 kWh$309
December7.43 m/s2,554 kWh$330

What a taller tower would buy

Measured at 10 m the wind in Hooker County averages 5.43 m/s; at 50 m it is 7.58 m/s. That gives a shear exponent of 0.207, typical of ordinary open country. Going from 20 m to 50 m takes output from 21,709 to 31,077 kWh a year, 43% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6.27 m/s21,709 kWh36 years
30 m6.82 m/s25,743 kWh30 years
40 m7.24 m/s28,726 kWh27 years
50 m7.58 m/s31,077 kWh25 years

Counties around Hooker County

1 of the 6 closest counties is windier at turbine height; the windiest, Cherry County, averages 6.83 m/s.

Sun versus wind in Hooker County

Hooker County gets 4.59 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,340 kWh a year; one kW of the turbine above makes 2,575. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.