TurbinePayback

Wind Turbine Payback in McPherson County, NE

Wind turbine payback in McPherson County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in McPherson County, NE averages 6.59 m/s (14.7 mph). A 10 kW turbine there would make about 24,069 kWh a year, worth $3,110 at NE's 12.92¢/kWh. Against an installed cost of about $100,000, that is a payback of 32 years, and the turbine is built to last about 20.

What to do in McPherson County

A home turbine is not worth buying for savings in McPherson County unless your spot is far windier than the county average, 8.8 m/s at the hub against 6.59 m/s here. Per kW, solar panels would make about 1,340 kWh a year here against the turbine's 2,407, so get a solar quote first.

What would have to change

Against the rest of NE

McPherson County is the 119th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NE is Cherry County at 6.83 m/s, payback 30 years.

Month by month in McPherson County

April is the strongest month here, at 7.21 m/s and about 2,348 kWh. July is the weakest, 5.58 m/s and 1,412 kWh, so the best month makes 1.7 times the worst. November to March brings in 46% of the year's output in McPherson County.

MonthWind at 30 mOutputWorth
January7.07 m/s2,340 kWh$302
February6.94 m/s2,040 kWh$264
March6.99 m/s2,291 kWh$296
April7.21 m/s2,348 kWh$303
May6.54 m/s2,014 kWh$260
June6.04 m/s1,643 kWh$212
July5.58 m/s1,412 kWh$182
August5.59 m/s1,418 kWh$183
September6.33 m/s1,818 kWh$235
October6.84 m/s2,198 kWh$284
November6.93 m/s2,180 kWh$282
December7.00 m/s2,296 kWh$297

What a taller tower would buy

Measured at 10 m the wind in McPherson County averages 5.22 m/s; at 50 m it is 7.34 m/s. That gives a shear exponent of 0.212, typical of ordinary open country. Going from 20 m to 50 m takes output from 20,031 to 29,437 kWh a year, 47% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6.04 m/s20,031 kWh39 years
30 m6.59 m/s24,044 kWh32 years
40 m7 m/s27,049 kWh29 years
50 m7.34 m/s29,437 kWh26 years

Counties around McPherson County

4 of the 6 closest counties are windier at turbine height; the windiest, Hooker County, averages 6.82 m/s.

Sun versus wind in McPherson County

McPherson County gets 4.59 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,340 kWh a year; one kW of the turbine above makes 2,407. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.8 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.