TurbinePayback

Wind Turbine Payback in Hubbard County, MN

Wind turbine payback in Hubbard County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Hubbard County, MN averages 6.51 m/s (14.6 mph). A 10 kW turbine there would make about 23,481 kWh a year, worth $3,860 at MN's 16.44¢/kWh. Against an installed cost of about $100,000, that is a payback of 26 years, and the turbine is built to last about 20.

What to do in Hubbard County

A home turbine is not worth buying for savings in Hubbard County unless your spot is far windier than the county average, 7.5 m/s at the hub against 6.51 m/s here. Per kW, solar panels would make about 1,083 kWh a year here against the turbine's 2,348, so get a solar quote first.

What would have to change

Against the rest of MN

Hubbard County is the 193rd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MN is Lincoln County at 6.68 m/s, payback 25 years.

Month by month in Hubbard County

October is the strongest month here, at 6.86 m/s and about 2,211 kWh. July is the weakest, 5.66 m/s and 1,462 kWh, so the best month makes 1.5 times the worst. November to March brings in 44% of the year's output in Hubbard County.

MonthWind at 30 mOutputWorth
January6.78 m/s2,161 kWh$355
February6.80 m/s1,967 kWh$323
March6.71 m/s2,116 kWh$348
April6.98 m/s2,209 kWh$363
May6.62 m/s2,060 kWh$339
June6.14 m/s1,704 kWh$280
July5.66 m/s1,462 kWh$240
August5.80 m/s1,546 kWh$254
September6.59 m/s1,978 kWh$325
October6.86 m/s2,211 kWh$363
November6.71 m/s2,048 kWh$337
December6.48 m/s1,976 kWh$325

What a taller tower would buy

Measured at 10 m the wind in Hubbard County averages 5.19 m/s; at 50 m it is 7.23 m/s. That gives a shear exponent of 0.206, typical of ordinary open country. Going from 20 m to 50 m takes output from 19,603 to 28,671 kWh a year, 46% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.99 m/s19,603 kWh31 years
30 m6.51 m/s23,465 kWh26 years
40 m6.91 m/s26,362 kWh23 years
50 m7.23 m/s28,671 kWh21 years

Counties around Hubbard County

3 of the 6 closest counties are windier at turbine height; the windiest, Becker County, averages 6.62 m/s.

Sun versus wind in Hubbard County

Hubbard County gets 3.71 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,083 kWh a year; one kW of the turbine above makes 2,348. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.2 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.