Wind Turbine Payback in Wadena County, MN

Wind turbine payback in Wadena County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Wadena County, MN averages 6.45 m/s (14.4 mph). A 10 kW turbine there would make about 23,038 kWh a year, worth $3,787 at MN's 16.44¢/kWh. Against an installed cost of about $100,000, that is a payback of 26 years, and the turbine is built to last about 20.

What to do in Wadena County

A home turbine is not worth buying for savings in Wadena County unless your spot is far windier than the county average, 7.5 m/s at the hub against 6.45 m/s here. Per kW, solar panels would make about 1,101 kWh a year here against the turbine's 2,304, so get a solar quote first.

What would have to change

Against the rest of MN

Wadena County is the 257th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MN is Lincoln County at 6.68 m/s, payback 25 years.

Month by month in Wadena County

April is the strongest month here, at 6.99 m/s and about 2,218 kWh. July is the weakest, 5.52 m/s and 1,373 kWh, so the best month makes 1.6 times the worst. November to March brings in 44% of the year's output in Wadena County.

MonthWind at 30 mOutputWorth
January6.73 m/s2,132 kWh$351
February6.79 m/s1,956 kWh$322
March6.68 m/s2,099 kWh$345
April6.99 m/s2,218 kWh$365
May6.61 m/s2,060 kWh$339
June6.04 m/s1,644 kWh$270
July5.52 m/s1,373 kWh$226
August5.66 m/s1,462 kWh$240
September6.52 m/s1,939 kWh$319
October6.82 m/s2,188 kWh$360
November6.65 m/s2,015 kWh$331
December6.43 m/s1,942 kWh$319

What a taller tower would buy

Measured at 10 m the wind in Wadena County averages 5.13 m/s; at 50 m it is 7.18 m/s. That gives a shear exponent of 0.209, typical of ordinary open country. Going from 20 m to 50 m takes output from 19,176 to 28,320 kWh a year, 48% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.93 m/s19,176 kWh32 years
30 m6.45 m/s23,060 kWh26 years
40 m6.85 m/s25,985 kWh23 years
50 m7.18 m/s28,320 kWh22 years

Counties around Wadena County

3 of the 6 closest counties are windier at turbine height; the windiest, Becker County, averages 6.62 m/s.

Sun versus wind in Wadena County

Wadena County gets 3.77 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,101 kWh a year; one kW of the turbine above makes 2,304. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.1 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.