Wind Turbine Payback in Cass County, MN

Wind turbine payback in Cass County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Cass County, MN averages 6.38 m/s (14.3 mph). A 10 kW turbine there would make about 22,521 kWh a year, worth $3,702 at MN's 16.44¢/kWh. Against an installed cost of about $100,000, that is a payback of 27 years, and the turbine is built to last about 20.

What to do in Cass County

A home turbine is not worth buying for savings in Cass County unless your spot is far windier than the county average, 7.5 m/s at the hub against 6.38 m/s here. Per kW, solar panels would make about 1,101 kWh a year here against the turbine's 2,252, so get a solar quote first.

What would have to change

Against the rest of MN

Cass County is the 359th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MN is Lincoln County at 6.68 m/s, payback 25 years.

Month by month in Cass County

April is the strongest month here, at 6.89 m/s and about 2,158 kWh. July is the weakest, 5.61 m/s and 1,430 kWh, so the best month makes 1.5 times the worst. November to March brings in 43% of the year's output in Cass County.

MonthWind at 30 mOutputWorth
January6.54 m/s2,013 kWh$331
February6.63 m/s1,869 kWh$307
March6.59 m/s2,046 kWh$336
April6.89 m/s2,158 kWh$355
May6.49 m/s1,979 kWh$325
June6.07 m/s1,662 kWh$273
July5.61 m/s1,430 kWh$235
August5.73 m/s1,503 kWh$247
September6.50 m/s1,926 kWh$317
October6.71 m/s2,119 kWh$348
November6.54 m/s1,948 kWh$320
December6.26 m/s1,837 kWh$302

What a taller tower would buy

Measured at 10 m the wind in Cass County averages 5.11 m/s; at 50 m it is 7.07 m/s. That gives a shear exponent of 0.202, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,782 to 27,542 kWh a year, 47% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.88 m/s18,782 kWh32 years
30 m6.38 m/s22,498 kWh27 years
40 m6.76 m/s25,300 kWh24 years
50 m7.07 m/s27,542 kWh22 years

Counties around Cass County

3 of the 6 closest counties are windier at turbine height; the windiest, Hubbard County, averages 6.51 m/s.

Sun versus wind in Cass County

Cass County gets 3.77 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,101 kWh a year; one kW of the turbine above makes 2,252. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.