TurbinePayback

Wind Turbine Payback in Jeff Davis County, TX

Wind turbine payback in Jeff Davis County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Jeff Davis County, TX averages 5.26 m/s (11.8 mph). A 10 kW turbine there would make about 14,327 kWh a year, worth $2,297 at TX's 16.03¢/kWh. Against an installed cost of about $100,000, that is a payback of 44 years, and the turbine is built to last about 20.

What to do in Jeff Davis County

A home turbine is not worth buying for savings in Jeff Davis County unless your spot is far windier than the county average, 7.6 m/s at the hub against 5.26 m/s here. Per kW, solar panels would make about 1,667 kWh a year here against the turbine's 1,433, so get a solar quote first.

What would have to change

Against the rest of TX

Jeff Davis County is the 1,339th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in TX is Dallam County at 6.82 m/s, payback 24 years.

Month by month in Jeff Davis County

April is the strongest month here, at 6.10 m/s and about 1,680 kWh. August is the weakest, 4.43 m/s and 756 kWh, so the best month makes 2.2 times the worst. November to March brings in 46% of the year's output in Jeff Davis County.

MonthWind at 30 mOutputWorth
January5.36 m/s1,278 kWh$205
February5.78 m/s1,390 kWh$223
March5.86 m/s1,584 kWh$254
April6.10 m/s1,680 kWh$269
May5.49 m/s1,355 kWh$217
June5.05 m/s1,056 kWh$169
July4.68 m/s886 kWh$142
August4.43 m/s756 kWh$121
September4.76 m/s900 kWh$144
October5.07 m/s1,102 kWh$177
November5.29 m/s1,195 kWh$192
December5.34 m/s1,267 kWh$203

What a taller tower would buy

Measured at 10 m the wind in Jeff Davis County averages 4.19 m/s; at 50 m it is 5.85 m/s. That gives a shear exponent of 0.207, typical of ordinary open country. Going from 20 m to 50 m takes output from 11,467 to 18,595 kWh a year, 62% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.84 m/s11,467 kWh54 years
30 m5.26 m/s14,348 kWh44 years
40 m5.59 m/s16,659 kWh37 years
50 m5.85 m/s18,595 kWh34 years

Counties around Jeff Davis County

4 of the 6 closest counties are windier at turbine height; the windiest, Pecos County, averages 6.32 m/s.

Sun versus wind in Jeff Davis County

Jeff Davis County gets 5.71 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,667 kWh a year; one kW of the turbine above makes 1,433. Kilowatt for kilowatt, panels make 1.2 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.