TurbinePayback

Wind Turbine Payback in Jones County, IA

Wind turbine payback in Jones County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Jones County, IA averages 6.01 m/s (13.4 mph). A 10 kW turbine there would make about 19,778 kWh a year, worth $2,878 at IA's 14.55¢/kWh. Against an installed cost of about $100,000, that is a payback of 35 years, and the turbine is built to last about 20.

What to do in Jones County

A home turbine is not worth buying for savings in Jones County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.01 m/s here. Per kW, solar panels would make about 1,156 kWh a year here against the turbine's 1,978, so get a solar quote first.

What would have to change

Against the rest of IA

Jones County is the 826th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in IA is Dickinson County at 6.59 m/s, payback 29 years.

Month by month in Jones County

April is the strongest month here, at 6.94 m/s and about 2,189 kWh. August is the weakest, 4.72 m/s and 907 kWh, so the best month makes 2.4 times the worst. November to March brings in 48% of the year's output in Jones County.

MonthWind at 30 mOutputWorth
January6.46 m/s1,964 kWh$286
February6.51 m/s1,799 kWh$262
March6.64 m/s2,075 kWh$302
April6.94 m/s2,189 kWh$318
May6.17 m/s1,779 kWh$259
June5.38 m/s1,245 kWh$181
July4.72 m/s907 kWh$132
August4.72 m/s907 kWh$132
September5.59 m/s1,371 kWh$199
October6.32 m/s1,875 kWh$273
November6.51 m/s1,928 kWh$281
December6.24 m/s1,824 kWh$265

What a taller tower would buy

Measured at 10 m the wind in Jones County averages 4.68 m/s; at 50 m it is 6.75 m/s. That gives a shear exponent of 0.228, typical of ordinary open country. Going from 20 m to 50 m takes output from 15,874 to 25,239 kWh a year, 59% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.48 m/s15,874 kWh43 years
30 m6.01 m/s19,763 kWh35 years
40 m6.42 m/s22,781 kWh30 years
50 m6.75 m/s25,239 kWh27 years

Counties around Jones County

2 of the 6 closest counties are windier at turbine height; the windiest, Linn County, averages 6.07 m/s.

Sun versus wind in Jones County

Jones County gets 3.96 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,156 kWh a year; one kW of the turbine above makes 1,978. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.7 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.