TurbinePayback

Wind Turbine Payback in Kanabec County, MN

Wind turbine payback in Kanabec County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Kanabec County, MN averages 6.14 m/s (13.7 mph). A 10 kW turbine there would make about 20,742 kWh a year, worth $3,410 at MN's 16.44¢/kWh. Against an installed cost of about $100,000, that is a payback of 29 years, and the turbine is built to last about 20.

What to do in Kanabec County

A home turbine is not worth buying for savings in Kanabec County unless your spot is far windier than the county average, 7.5 m/s at the hub against 6.14 m/s here. Per kW, solar panels would make about 1,110 kWh a year here against the turbine's 2,074, so get a solar quote first.

What would have to change

Against the rest of MN

Kanabec County is the 646th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MN is Lincoln County at 6.68 m/s, payback 25 years.

Month by month in Kanabec County

April is the strongest month here, at 6.70 m/s and about 2,046 kWh. July is the weakest, 5.23 m/s and 1,198 kWh, so the best month makes 1.7 times the worst. November to March brings in 44% of the year's output in Kanabec County.

MonthWind at 30 mOutputWorth
January6.43 m/s1,941 kWh$319
February6.55 m/s1,824 kWh$300
March6.39 m/s1,919 kWh$315
April6.70 m/s2,046 kWh$336
May6.26 m/s1,835 kWh$302
June5.76 m/s1,471 kWh$242
July5.23 m/s1,198 kWh$197
August5.35 m/s1,273 kWh$209
September6.18 m/s1,726 kWh$284
October6.49 m/s1,981 kWh$326
November6.32 m/s1,814 kWh$298
December6.09 m/s1,728 kWh$284

What a taller tower would buy

Measured at 10 m the wind in Kanabec County averages 4.82 m/s; at 50 m it is 6.87 m/s. That gives a shear exponent of 0.220, typical of ordinary open country. Going from 20 m to 50 m takes output from 16,877 to 26,109 kWh a year, 55% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.62 m/s16,877 kWh36 years
30 m6.14 m/s20,740 kWh29 years
40 m6.54 m/s23,708 kWh26 years
50 m6.87 m/s26,109 kWh23 years

Counties around Kanabec County

1 of the 6 closest counties is windier at turbine height; the windiest, Mille Lacs County, averages 6.32 m/s.

Sun versus wind in Kanabec County

Kanabec County gets 3.8 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,110 kWh a year; one kW of the turbine above makes 2,074. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.