TurbinePayback

Wind Turbine Payback in Mille Lacs County, MN

Wind turbine payback in Mille Lacs County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Mille Lacs County, MN averages 6.32 m/s (14.1 mph). A 10 kW turbine there would make about 22,077 kWh a year, worth $3,629 at MN's 16.44¢/kWh. Against an installed cost of about $100,000, that is a payback of 28 years, and the turbine is built to last about 20.

What to do in Mille Lacs County

A home turbine is not worth buying for savings in Mille Lacs County unless your spot is far windier than the county average, 7.5 m/s at the hub against 6.32 m/s here. Per kW, solar panels would make about 1,110 kWh a year here against the turbine's 2,208, so get a solar quote first.

What would have to change

Against the rest of MN

Mille Lacs County is the 452nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MN is Lincoln County at 6.68 m/s, payback 25 years.

Month by month in Mille Lacs County

April is the strongest month here, at 6.93 m/s and about 2,182 kWh. July is the weakest, 5.38 m/s and 1,288 kWh, so the best month makes 1.7 times the worst. November to March brings in 44% of the year's output in Mille Lacs County.

MonthWind at 30 mOutputWorth
January6.60 m/s2,050 kWh$337
February6.68 m/s1,897 kWh$312
March6.57 m/s2,033 kWh$334
April6.93 m/s2,182 kWh$359
May6.49 m/s1,983 kWh$326
June5.94 m/s1,585 kWh$261
July5.38 m/s1,288 kWh$212
August5.49 m/s1,353 kWh$222
September6.37 m/s1,842 kWh$303
October6.70 m/s2,111 kWh$347
November6.51 m/s1,929 kWh$317
December6.27 m/s1,842 kWh$303

What a taller tower would buy

Measured at 10 m the wind in Mille Lacs County averages 5.01 m/s; at 50 m it is 7.04 m/s. That gives a shear exponent of 0.211, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,244 to 27,328 kWh a year, 50% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.8 m/s18,244 kWh33 years
30 m6.32 m/s22,082 kWh28 years
40 m6.72 m/s24,993 kWh24 years
50 m7.04 m/s27,328 kWh22 years

Counties around Mille Lacs County

1 of the 6 closest counties is windier at turbine height; the windiest, Morrison County, averages 6.34 m/s.

Sun versus wind in Mille Lacs County

Mille Lacs County gets 3.8 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,110 kWh a year; one kW of the turbine above makes 2,208. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.