Wind Turbine Payback in Kittson County, MN

Wind turbine payback in Kittson County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Kittson County, MN averages 6.25 m/s (14 mph). A 10 kW turbine there would make about 21,558 kWh a year, worth $3,544 at MN's 16.44¢/kWh. Against an installed cost of about $100,000, that is a payback of 28 years, and the turbine is built to last about 20.

What to do in Kittson County

A home turbine is not worth buying for savings in Kittson County unless your spot is far windier than the county average, 7.5 m/s at the hub against 6.25 m/s here. Per kW, solar panels would make about 1,101 kWh a year here against the turbine's 2,156, so get a solar quote first.

What would have to change

Against the rest of MN

Kittson County is the 528th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MN is Lincoln County at 6.68 m/s, payback 25 years.

Month by month in Kittson County

October is the strongest month here, at 6.64 m/s and about 2,076 kWh. July is the weakest, 5.60 m/s and 1,423 kWh, so the best month makes 1.5 times the worst. November to March brings in 42% of the year's output in Kittson County.

MonthWind at 30 mOutputWorth
January6.28 m/s1,851 kWh$304
February6.20 m/s1,626 kWh$267
March6.50 m/s1,986 kWh$326
April6.68 m/s2,030 kWh$334
May6.58 m/s2,037 kWh$335
June5.98 m/s1,605 kWh$264
July5.60 m/s1,423 kWh$234
August5.69 m/s1,479 kWh$243
September6.33 m/s1,818 kWh$299
October6.64 m/s2,076 kWh$341
November6.45 m/s1,895 kWh$312
December6.08 m/s1,721 kWh$283

What a taller tower would buy

Measured at 10 m the wind in Kittson County averages 4.95 m/s; at 50 m it is 6.96 m/s. That gives a shear exponent of 0.212, typical of ordinary open country. Going from 20 m to 50 m takes output from 17,721 to 26,756 kWh a year, 51% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.73 m/s17,721 kWh34 years
30 m6.25 m/s21,526 kWh28 years
40 m6.64 m/s24,424 kWh25 years
50 m6.96 m/s26,756 kWh23 years

Counties around Kittson County

5 of the 6 closest counties are windier at turbine height; the windiest, Grand Forks County, averages 6.4 m/s.

Sun versus wind in Kittson County

Kittson County gets 3.77 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,101 kWh a year; one kW of the turbine above makes 2,156. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.