Wind Turbine Payback in Grand Forks County, ND

Wind turbine payback in Grand Forks County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Grand Forks County, ND averages 6.4 m/s (14.3 mph). A 10 kW turbine there would make about 22,669 kWh a year, worth $2,825 at ND's 12.46¢/kWh. Against an installed cost of about $100,000, that is a payback of 35 years, and the turbine is built to last about 20.

What to do in Grand Forks County

A home turbine is not worth buying for savings in Grand Forks County unless your spot is far windier than the county average, 9.1 m/s at the hub against 6.4 m/s here. Per kW, solar panels would make about 1,121 kWh a year here against the turbine's 2,267, so get a solar quote first.

What would have to change

Against the rest of ND

Grand Forks County is the 322nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ND is Bowman County at 6.79 m/s, payback 31 years.

Month by month in Grand Forks County

October is the strongest month here, at 6.93 m/s and about 2,257 kWh. July is the weakest, 5.57 m/s and 1,405 kWh, so the best month makes 1.6 times the worst. November to March brings in 43% of the year's output in Grand Forks County.

MonthWind at 30 mOutputWorth
January6.50 m/s1,990 kWh$248
February6.42 m/s1,752 kWh$218
March6.64 m/s2,074 kWh$258
April6.80 m/s2,104 kWh$262
May6.70 m/s2,113 kWh$263
June6.06 m/s1,658 kWh$207
July5.57 m/s1,405 kWh$175
August5.70 m/s1,488 kWh$185
September6.49 m/s1,921 kWh$239
October6.93 m/s2,257 kWh$281
November6.67 m/s2,029 kWh$253
December6.31 m/s1,866 kWh$233

What a taller tower would buy

Measured at 10 m the wind in Grand Forks County averages 5.08 m/s; at 50 m it is 7.12 m/s. That gives a shear exponent of 0.210, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,770 to 27,897 kWh a year, 49% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.87 m/s18,770 kWh43 years
30 m6.4 m/s22,638 kWh36 years
40 m6.79 m/s25,559 kWh31 years
50 m7.12 m/s27,897 kWh29 years

Counties around Grand Forks County

3 of the 6 closest counties are windier at turbine height; the windiest, Nelson County, averages 6.53 m/s.

Sun versus wind in Grand Forks County

Grand Forks County gets 3.84 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,121 kWh a year; one kW of the turbine above makes 2,267. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.