TurbinePayback

Wind Turbine Payback in Lewis and Clark County, MT

Wind turbine payback in Lewis and Clark County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Lewis and Clark County, MT averages 3.93 m/s (8.8 mph). A 10 kW turbine there would make about 6,231 kWh a year, worth $880 at MT's 14.13¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Lewis and Clark County

A home turbine is not worth buying for savings in Lewis and Clark County unless your spot is far windier than the county average, 8.2 m/s at the hub against 3.93 m/s here. Per kW, solar panels would make about 1,133 kWh a year here against the turbine's 623, so get a solar quote first.

What would have to change

Against the rest of MT

Lewis and Clark County is the 2,112th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MT is Fallon County at 6.64 m/s, payback 29 years.

Month by month in Lewis and Clark County

January is the strongest month here, at 4.62 m/s and about 856 kWh. August is the weakest, 3.13 m/s and 254 kWh, so the best month makes 3.4 times the worst. November to March brings in 57% of the year's output in Lewis and Clark County.

MonthWind at 30 mOutputWorth
January4.62 m/s856 kWh$121
February4.25 m/s608 kWh$86
March4.31 m/s700 kWh$99
April3.97 m/s529 kWh$75
May3.55 m/s383 kWh$54
June3.49 m/s351 kWh$50
July3.24 m/s285 kWh$40
August3.13 m/s254 kWh$36
September3.48 m/s349 kWh$49
October4.10 m/s604 kWh$85
November4.52 m/s778 kWh$110
December4.48 m/s783 kWh$111

What a taller tower would buy

Measured at 10 m the wind in Lewis and Clark County averages 2.66 m/s; at 50 m it is 4.71 m/s. That gives a shear exponent of 0.355, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 3,950 to 10,635 kWh a year, 169% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.4 m/s3,950 kWhover 100 years
30 m3.93 m/s6,225 kWhover 100 years
40 m4.35 m/s8,467 kWh84 years
50 m4.71 m/s10,635 kWh67 years

Counties around Lewis and Clark County

4 of the 6 closest counties are windier at turbine height; the windiest, Cascade County, averages 5.69 m/s.

Sun versus wind in Lewis and Clark County

Lewis and Clark County gets 3.88 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,133 kWh a year; one kW of the turbine above makes 623. Kilowatt for kilowatt, panels make 1.8 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.