TurbinePayback

Wind Turbine Payback in Teton County, MT

Wind turbine payback in Teton County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Teton County, MT averages 5.4 m/s (12.1 mph). A 10 kW turbine there would make about 15,319 kWh a year, worth $2,165 at MT's 14.13¢/kWh. Against an installed cost of about $100,000, that is a payback of 46 years, and the turbine is built to last about 20.

What to do in Teton County

A home turbine is not worth buying for savings in Teton County unless your spot is far windier than the county average, 8.2 m/s at the hub against 5.4 m/s here. Per kW, solar panels would make about 1,133 kWh a year here against the turbine's 1,532, so get a solar quote first.

What would have to change

Against the rest of MT

Teton County is the 1,283rd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MT is Fallon County at 6.64 m/s, payback 29 years.

Month by month in Teton County

January is the strongest month here, at 6.70 m/s and about 2,111 kWh. August is the weakest, 4.13 m/s and 615 kWh, so the best month makes 3.4 times the worst. November to March brings in 58% of the year's output in Teton County.

MonthWind at 30 mOutputWorth
January6.70 m/s2,111 kWh$298
February5.90 m/s1,457 kWh$206
March5.84 m/s1,575 kWh$223
April5.24 m/s1,166 kWh$165
May4.74 m/s920 kWh$130
June4.65 m/s841 kWh$119
July4.30 m/s695 kWh$98
August4.13 m/s615 kWh$87
September4.64 m/s836 kWh$118
October5.70 m/s1,484 kWh$210
November6.47 m/s1,907 kWh$269
December6.43 m/s1,944 kWh$275

What a taller tower would buy

Measured at 10 m the wind in Teton County averages 3.92 m/s; at 50 m it is 6.26 m/s. That gives a shear exponent of 0.291, typical of ordinary open country. Going from 20 m to 50 m takes output from 11,178 to 21,632 kWh a year, 94% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.79 m/s11,178 kWh63 years
30 m5.4 m/s15,285 kWh46 years
40 m5.87 m/s18,716 kWh38 years
50 m6.26 m/s21,632 kWh33 years

Counties around Teton County

3 of the 6 closest counties are windier at turbine height; the windiest, Toole County, averages 6.17 m/s.

Sun versus wind in Teton County

Teton County gets 3.88 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,133 kWh a year; one kW of the turbine above makes 1,532. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.4 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.