Wind Turbine Payback in Madison County, MT

Wind turbine payback in Madison County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Madison County, MT averages 4.63 m/s (10.4 mph). A 10 kW turbine there would make about 10,132 kWh a year, worth $1,432 at MT's 14.13¢/kWh. Against an installed cost of about $100,000, that is a payback of 70 years, and the turbine is built to last about 20.

What to do in Madison County

A home turbine is not worth buying for savings in Madison County unless your spot is far windier than the county average, 8.2 m/s at the hub against 4.63 m/s here. Per kW, solar panels would make about 1,197 kWh a year here against the turbine's 1,013, so get a solar quote first.

What would have to change

Against the rest of MT

Madison County is the 1,671st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MT is Fallon County at 6.64 m/s, payback 29 years.

Month by month in Madison County

January is the strongest month here, at 6.00 m/s and about 1,674 kWh. July is the weakest, 3.40 m/s and 336 kWh, so the best month makes 5.0 times the worst. November to March brings in 64% of the year's output in Madison County.

MonthWind at 30 mOutputWorth
January6.00 m/s1,674 kWh$237
February5.31 m/s1,126 kWh$159
March5.21 m/s1,188 kWh$168
April4.47 m/s752 kWh$106
May3.86 m/s499 kWh$71
June3.82 m/s469 kWh$66
July3.40 m/s336 kWh$47
August3.49 m/s365 kWh$52
September3.93 m/s511 kWh$72
October4.72 m/s906 kWh$128
November5.58 m/s1,368 kWh$193
December5.81 m/s1,552 kWh$219

What a taller tower would buy

Measured at 10 m the wind in Madison County averages 3.57 m/s; at 50 m it is 5.22 m/s. That gives a shear exponent of 0.236, typical of ordinary open country. Going from 20 m to 50 m takes output from 7,650 to 14,046 kWh a year, 84% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.2 m/s7,650 kWh93 years
30 m4.63 m/s10,115 kWh70 years
40 m4.95 m/s12,214 kWh58 years
50 m5.22 m/s14,046 kWh50 years

Counties around Madison County

1 of the 6 closest counties is windier at turbine height; the windiest, Park County, averages 4.68 m/s.

Sun versus wind in Madison County

Madison County gets 4.1 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,197 kWh a year; one kW of the turbine above makes 1,013. Kilowatt for kilowatt, panels make 1.2 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.