No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Platte County, NE averages 6.53 m/s (14.6 mph). A 10 kW turbine there would make about 23,628 kWh a year, worth $3,053 at NE's 12.92¢/kWh. Against an installed cost of about $100,000, that is a payback of 33 years, and the turbine is built to last about 20.

What to do in Platte County

A home turbine is not worth buying for savings in Platte County unless your spot is far windier than the county average, 8.8 m/s at the hub against 6.53 m/s here. Per kW, solar panels would make about 1,256 kWh a year here against the turbine's 2,363, so get a solar quote first.

What would have to change

Against the rest of NE

Platte County is the 165th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NE is Cherry County at 6.83 m/s, payback 30 years.

Month by month in Platte County

April is the strongest month here, at 7.39 m/s and about 2,448 kWh. August is the weakest, 5.32 m/s and 1,255 kWh, so the best month makes 2.0 times the worst. November to March brings in 45% of the year's output in Platte County.

MonthWind at 30 mOutputWorth
January6.79 m/s2,168 kWh$280
February6.80 m/s1,963 kWh$254
March7.00 m/s2,300 kWh$297
April7.39 m/s2,448 kWh$316
May6.74 m/s2,135 kWh$276
June6.17 m/s1,725 kWh$223
July5.34 m/s1,265 kWh$163
August5.32 m/s1,255 kWh$162
September6.46 m/s1,899 kWh$245
October6.80 m/s2,174 kWh$281
November6.87 m/s2,146 kWh$277
December6.68 m/s2,102 kWh$272

What a taller tower would buy

Measured at 10 m the wind in Platte County averages 5.14 m/s; at 50 m it is 7.3 m/s. That gives a shear exponent of 0.218, typical of ordinary open country. Going from 20 m to 50 m takes output from 19,543 to 29,160 kWh a year, 49% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.98 m/s19,543 kWh40 years
30 m6.53 m/s23,633 kWh33 years
40 m6.95 m/s26,709 kWh29 years
50 m7.3 m/s29,160 kWh27 years

Counties around Platte County

4 of the 6 closest counties are windier at turbine height; the windiest, Madison County, averages 6.67 m/s.

Sun versus wind in Platte County

Platte County gets 4.3 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,256 kWh a year; one kW of the turbine above makes 2,363. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.