Wind Turbine Payback in McKenzie County, ND

Wind turbine payback in McKenzie County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in McKenzie County, ND averages 6.59 m/s (14.7 mph). A 10 kW turbine there would make about 24,069 kWh a year, worth $2,999 at ND's 12.46¢/kWh. Against an installed cost of about $100,000, that is a payback of 33 years, and the turbine is built to last about 20.

What to do in McKenzie County

A home turbine is not worth buying for savings in McKenzie County unless your spot is far windier than the county average, 9.1 m/s at the hub against 6.59 m/s here. Per kW, solar panels would make about 1,156 kWh a year here against the turbine's 2,407, so get a solar quote first.

What would have to change

Against the rest of ND

McKenzie County is the 119th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ND is Bowman County at 6.79 m/s, payback 31 years.

Month by month in McKenzie County

October is the strongest month here, at 7.04 m/s and about 2,324 kWh. July is the weakest, 5.80 m/s and 1,548 kWh, so the best month makes 1.5 times the worst. November to March brings in 44% of the year's output in McKenzie County.

MonthWind at 30 mOutputWorth
January7.01 m/s2,302 kWh$287
February6.39 m/s1,736 kWh$216
March6.82 m/s2,186 kWh$272
April6.85 m/s2,132 kWh$266
May6.63 m/s2,069 kWh$258
June6.22 m/s1,756 kWh$219
July5.80 m/s1,548 kWh$193
August5.89 m/s1,604 kWh$200
September6.49 m/s1,915 kWh$239
October7.04 m/s2,324 kWh$290
November7.04 m/s2,243 kWh$279
December6.88 m/s2,225 kWh$277

What a taller tower would buy

Measured at 10 m the wind in McKenzie County averages 5.28 m/s; at 50 m it is 7.31 m/s. That gives a shear exponent of 0.202, typical of ordinary open country. Going from 20 m to 50 m takes output from 20,259 to 29,229 kWh a year, 44% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6.07 m/s20,259 kWh40 years
30 m6.59 m/s24,093 kWh33 years
40 m6.99 m/s26,956 kWh30 years
50 m7.31 m/s29,229 kWh28 years

Counties around McKenzie County

2 of the 6 closest counties are windier at turbine height; the windiest, Billings County, averages 6.76 m/s.

Sun versus wind in McKenzie County

McKenzie County gets 3.96 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,156 kWh a year; one kW of the turbine above makes 2,407. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.1 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.