Wind Turbine Payback in Billings County, ND

Wind turbine payback in Billings County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Billings County, ND averages 6.76 m/s (15.1 mph). A 10 kW turbine there would make about 25,311 kWh a year, worth $3,154 at ND's 12.46¢/kWh. Against an installed cost of about $100,000, that is a payback of 32 years, and the turbine is built to last about 20.

What to do in Billings County

A home turbine is not worth buying for savings in Billings County unless your spot is far windier than the county average, 9.1 m/s at the hub against 6.76 m/s here. Per kW, solar panels would make about 1,156 kWh a year here against the turbine's 2,531, so get a solar quote first.

What would have to change

Against the rest of ND

Billings County is the 40th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ND is Bowman County at 6.79 m/s, payback 31 years.

Month by month in Billings County

January is the strongest month here, at 7.36 m/s and about 2,511 kWh. July is the weakest, 5.90 m/s and 1,614 kWh, so the best month makes 1.6 times the worst. November to March brings in 45% of the year's output in Billings County.

MonthWind at 30 mOutputWorth
January7.36 m/s2,511 kWh$313
February6.65 m/s1,883 kWh$235
March7.00 m/s2,295 kWh$286
April6.94 m/s2,189 kWh$273
May6.71 m/s2,118 kWh$264
June6.28 m/s1,793 kWh$223
July5.90 m/s1,614 kWh$201
August5.99 m/s1,665 kWh$207
September6.62 m/s1,995 kWh$249
October7.23 m/s2,436 kWh$304
November7.28 m/s2,384 kWh$297
December7.18 m/s2,404 kWh$300

What a taller tower would buy

Measured at 10 m the wind in Billings County averages 5.43 m/s; at 50 m it is 7.49 m/s. That gives a shear exponent of 0.200, typical of ordinary open country. Going from 20 m to 50 m takes output from 21,453 to 30,468 kWh a year, 42% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6.24 m/s21,453 kWh37 years
30 m6.76 m/s25,330 kWh32 years
40 m7.16 m/s28,201 kWh29 years
50 m7.49 m/s30,468 kWh26 years

Counties around Billings County

1 of the 6 closest counties is windier at turbine height; the windiest, Slope County, averages 6.78 m/s.

Sun versus wind in Billings County

Billings County gets 3.96 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,156 kWh a year; one kW of the turbine above makes 2,531. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.2 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.