Wind Turbine Payback in Miner County, SD

Wind turbine payback in Miner County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Miner County, SD averages 6.49 m/s (14.5 mph). A 10 kW turbine there would make about 23,333 kWh a year, worth $3,402 at SD's 14.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 29 years, and the turbine is built to last about 20.

What to do in Miner County

A home turbine is not worth buying for savings in Miner County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.49 m/s here. Per kW, solar panels would make about 1,191 kWh a year here against the turbine's 2,333, so get a solar quote first.

What would have to change

Against the rest of SD

Miner County is the 219th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in SD is Todd County at 6.77 m/s, payback 27 years.

Month by month in Miner County

April is the strongest month here, at 7.27 m/s and about 2,380 kWh. July is the weakest, 5.65 m/s and 1,456 kWh, so the best month makes 1.6 times the worst. November to March brings in 42% of the year's output in Miner County.

MonthWind at 30 mOutputWorth
January6.39 m/s1,919 kWh$280
February6.46 m/s1,774 kWh$259
March6.88 m/s2,226 kWh$325
April7.27 m/s2,380 kWh$347
May6.82 m/s2,188 kWh$319
June6.25 m/s1,770 kWh$258
July5.65 m/s1,456 kWh$212
August5.68 m/s1,473 kWh$215
September6.70 m/s2,047 kWh$298
October6.91 m/s2,243 kWh$327
November6.61 m/s1,988 kWh$290
December6.32 m/s1,874 kWh$273

What a taller tower would buy

Measured at 10 m the wind in Miner County averages 5.16 m/s; at 50 m it is 7.22 m/s. That gives a shear exponent of 0.209, typical of ordinary open country. Going from 20 m to 50 m takes output from 19,420 to 28,601 kWh a year, 47% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.96 m/s19,420 kWh35 years
30 m6.49 m/s23,325 kWh29 years
40 m6.89 m/s26,260 kWh26 years
50 m7.22 m/s28,601 kWh24 years

Counties around Miner County

2 of the 6 closest counties are windier at turbine height; the windiest, Lake County, averages 6.61 m/s.

Sun versus wind in Miner County

Miner County gets 4.08 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,191 kWh a year; one kW of the turbine above makes 2,333. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.