TurbinePayback

Wind Turbine Payback in Mineral County, MT

Wind turbine payback in Mineral County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Mineral County, MT averages 3 m/s (6.7 mph). A 10 kW turbine there would make about 2,601 kWh a year, worth $368 at MT's 14.13¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Mineral County

A home turbine is not worth buying for savings in Mineral County unless your spot is far windier than the county average, 8.2 m/s at the hub against 3 m/s here. Per kW, solar panels would make about 1,092 kWh a year here against the turbine's 260, so get a solar quote first.

What would have to change

Against the rest of MT

Mineral County is the 3,061st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MT is Fallon County at 6.64 m/s, payback 29 years.

Month by month in Mineral County

January is the strongest month here, at 3.35 m/s and about 320 kWh. July is the weakest, 2.57 m/s and 127 kWh, so the best month makes 2.5 times the worst. November to March brings in 54% of the year's output in Mineral County.

MonthWind at 30 mOutputWorth
January3.35 m/s320 kWh$45
February3.15 m/s235 kWh$33
March3.25 m/s288 kWh$41
April3.06 m/s230 kWh$32
May2.76 m/s165 kWh$23
June2.74 m/s156 kWh$22
July2.57 m/s127 kWh$18
August2.58 m/s128 kWh$18
September2.80 m/s168 kWh$24
October3.09 m/s244 kWh$34
November3.32 m/s300 kWh$42
December3.28 m/s298 kWh$42

What a taller tower would buy

Measured at 10 m the wind in Mineral County averages 2 m/s; at 50 m it is 3.62 m/s. That gives a shear exponent of 0.369, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,524 to 4,820 kWh a year, 216% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.58 m/s1,524 kWhover 100 years
30 m3 m/s2,595 kWhover 100 years
40 m3.33 m/s3,698 kWhover 100 years
50 m3.62 m/s4,820 kWhover 100 years

Counties around Mineral County

1 of the 6 closest counties is windier at turbine height; the windiest, Benewah County, averages 3.61 m/s.

Sun versus wind in Mineral County

Mineral County gets 3.74 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,092 kWh a year; one kW of the turbine above makes 260. Kilowatt for kilowatt, panels make 4.2 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.