Wind Turbine Payback in Sanders County, MT

Wind turbine payback in Sanders County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Sanders County, MT averages 2.89 m/s (6.5 mph). A 10 kW turbine there would make about 2,287 kWh a year, worth $323 at MT's 14.13¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Sanders County

A home turbine is not worth buying for savings in Sanders County unless your spot is far windier than the county average, 8.2 m/s at the hub against 2.89 m/s here. Per kW, solar panels would make about 1,092 kWh a year here against the turbine's 229, so get a solar quote first.

What would have to change

Against the rest of MT

Sanders County is the 3,113th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MT is Fallon County at 6.64 m/s, payback 29 years.

Month by month in Sanders County

March is the strongest month here, at 3.11 m/s and about 250 kWh. August is the weakest, 2.70 m/s and 152 kWh, so the best month makes 1.6 times the worst. November to March brings in 42% of the year's output in Sanders County.

MonthWind at 30 mOutputWorth
January2.82 m/s178 kWh$25
February2.81 m/s159 kWh$22
March3.11 m/s250 kWh$35
April3.09 m/s235 kWh$33
May2.90 m/s197 kWh$28
June2.89 m/s189 kWh$27
July2.79 m/s171 kWh$24
August2.70 m/s152 kWh$21
September2.81 m/s171 kWh$24
October2.97 m/s213 kWh$30
November2.99 m/s210 kWh$30
December2.82 m/s178 kWh$25

What a taller tower would buy

Measured at 10 m the wind in Sanders County averages 1.93 m/s; at 50 m it is 3.48 m/s. That gives a shear exponent of 0.366, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,327 to 4,250 kWh a year, 220% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.49 m/s1,327 kWhover 100 years
30 m2.89 m/s2,278 kWhover 100 years
40 m3.21 m/s3,255 kWhover 100 years
50 m3.48 m/s4,250 kWhover 100 years

Counties around Sanders County

5 of the 6 closest counties are windier at turbine height; the windiest, Kootenai County, averages 3.64 m/s.

Sun versus wind in Sanders County

Sanders County gets 3.74 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,092 kWh a year; one kW of the turbine above makes 229. Kilowatt for kilowatt, panels make 4.8 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.