Wind turbine payback in Phillips County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Phillips County, MT averages 6.17 m/s (13.8 mph). A 10 kW turbine there would make about 20,965 kWh a year, worth $2,962 at MT's 14.13¢/kWh. Against an installed cost of about $100,000, that is a payback of 34 years, and the turbine is built to last about 20.

What to do in Phillips County

A home turbine is not worth buying for savings in Phillips County unless your spot is far windier than the county average, 8.2 m/s at the hub against 6.17 m/s here. Per kW, solar panels would make about 1,159 kWh a year here against the turbine's 2,097, so get a solar quote first.

What would have to change

Against the rest of MT

Phillips County is the 608th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MT is Fallon County at 6.64 m/s, payback 29 years.

Month by month in Phillips County

January is the strongest month here, at 6.83 m/s and about 2,191 kWh. August is the weakest, 5.37 m/s and 1,284 kWh, so the best month makes 1.7 times the worst. November to March brings in 47% of the year's output in Phillips County.

MonthWind at 30 mOutputWorth
January6.83 m/s2,191 kWh$310
February6.07 m/s1,550 kWh$219
March6.41 m/s1,930 kWh$273
April6.34 m/s1,824 kWh$258
May6.14 m/s1,761 kWh$249
June5.84 m/s1,520 kWh$215
July5.40 m/s1,300 kWh$184
August5.37 m/s1,284 kWh$181
September5.70 m/s1,439 kWh$203
October6.51 m/s1,991 kWh$281
November6.78 m/s2,093 kWh$296
December6.56 m/s2,025 kWh$286

What a taller tower would buy

Measured at 10 m the wind in Phillips County averages 4.83 m/s; at 50 m it is 6.91 m/s. That gives a shear exponent of 0.223, typical of ordinary open country. Going from 20 m to 50 m takes output from 17,002 to 26,397 kWh a year, 55% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.63 m/s17,002 kWh42 years
30 m6.17 m/s20,935 kWh34 years
40 m6.57 m/s23,956 kWh30 years
50 m6.91 m/s26,397 kWh27 years

Counties around Phillips County

4 of the 6 closest counties are windier at turbine height; the windiest, Garfield County, averages 6.41 m/s.

Sun versus wind in Phillips County

Phillips County gets 3.97 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,159 kWh a year; one kW of the turbine above makes 2,097. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.8 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.