Wind Turbine Payback in Hill County, MT

Wind turbine payback in Hill County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Hill County, MT averages 6.21 m/s (13.9 mph). A 10 kW turbine there would make about 21,262 kWh a year, worth $3,004 at MT's 14.13¢/kWh. Against an installed cost of about $100,000, that is a payback of 33 years, and the turbine is built to last about 20.

What to do in Hill County

A home turbine is not worth buying for savings in Hill County unless your spot is far windier than the county average, 8.2 m/s at the hub against 6.21 m/s here. Per kW, solar panels would make about 1,142 kWh a year here against the turbine's 2,126, so get a solar quote first.

What would have to change

Against the rest of MT

Hill County is the 576th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MT is Fallon County at 6.64 m/s, payback 29 years.

Month by month in Hill County

January is the strongest month here, at 7.05 m/s and about 2,329 kWh. August is the weakest, 5.10 m/s and 1,121 kWh, so the best month makes 2.1 times the worst. November to March brings in 49% of the year's output in Hill County.

MonthWind at 30 mOutputWorth
January7.05 m/s2,329 kWh$329
February6.30 m/s1,684 kWh$238
March6.56 m/s2,027 kWh$286
April6.31 m/s1,810 kWh$256
May5.99 m/s1,668 kWh$236
June5.78 m/s1,484 kWh$210
July5.38 m/s1,291 kWh$182
August5.10 m/s1,121 kWh$158
September5.62 m/s1,387 kWh$196
October6.55 m/s2,021 kWh$286
November7.08 m/s2,269 kWh$321
December6.85 m/s2,204 kWh$311

What a taller tower would buy

Measured at 10 m the wind in Hill County averages 4.87 m/s; at 50 m it is 6.96 m/s. That gives a shear exponent of 0.222, typical of ordinary open country. Going from 20 m to 50 m takes output from 17,338 to 26,756 kWh a year, 54% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.68 m/s17,338 kWh41 years
30 m6.21 m/s21,290 kWh33 years
40 m6.62 m/s24,316 kWh29 years
50 m6.96 m/s26,756 kWh27 years

Counties around Hill County

1 of the 6 closest counties is windier at turbine height; the windiest, Blaine County, averages 6.31 m/s.

Sun versus wind in Hill County

Hill County gets 3.91 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,142 kWh a year; one kW of the turbine above makes 2,126. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.