Wind Turbine Payback in Blaine County, MT

Wind turbine payback in Blaine County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Blaine County, MT averages 6.31 m/s (14.1 mph). A 10 kW turbine there would make about 22,003 kWh a year, worth $3,109 at MT's 14.13¢/kWh. Against an installed cost of about $100,000, that is a payback of 32 years, and the turbine is built to last about 20.

What to do in Blaine County

A home turbine is not worth buying for savings in Blaine County unless your spot is far windier than the county average, 8.2 m/s at the hub against 6.31 m/s here. Per kW, solar panels would make about 1,162 kWh a year here against the turbine's 2,200, so get a solar quote first.

What would have to change

Against the rest of MT

Blaine County is the 460th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MT is Fallon County at 6.64 m/s, payback 29 years.

Month by month in Blaine County

January is the strongest month here, at 7.18 m/s and about 2,405 kWh. August is the weakest, 5.33 m/s and 1,258 kWh, so the best month makes 1.9 times the worst. November to March brings in 49% of the year's output in Blaine County.

MonthWind at 30 mOutputWorth
January7.18 m/s2,405 kWh$340
February6.33 m/s1,700 kWh$240
March6.62 m/s2,061 kWh$291
April6.40 m/s1,865 kWh$264
May6.15 m/s1,769 kWh$250
June5.86 m/s1,532 kWh$216
July5.45 m/s1,334 kWh$188
August5.33 m/s1,258 kWh$178
September5.77 m/s1,478 kWh$209
October6.66 m/s2,089 kWh$295
November7.11 m/s2,286 kWh$323
December6.90 m/s2,238 kWh$316

What a taller tower would buy

Measured at 10 m the wind in Blaine County averages 4.96 m/s; at 50 m it is 7.06 m/s. That gives a shear exponent of 0.219, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,052 to 27,471 kWh a year, 52% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.78 m/s18,052 kWh39 years
30 m6.31 m/s22,023 kWh32 years
40 m6.72 m/s25,044 kWh28 years
50 m7.06 m/s27,471 kWh26 years

Counties around Blaine County

None of the 6 closest counties is windier than Blaine County.

Sun versus wind in Blaine County

Blaine County gets 3.98 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,162 kWh a year; one kW of the turbine above makes 2,200. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.