TurbinePayback

Wind Turbine Payback in Lincoln County, MT

Wind turbine payback in Lincoln County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Lincoln County, MT averages 2.59 m/s (5.8 mph). A 10 kW turbine there would make about 1,543 kWh a year, worth $218 at MT's 14.13¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Lincoln County

A home turbine is not worth buying for savings in Lincoln County unless your spot is far windier than the county average, 8.2 m/s at the hub against 2.59 m/s here. Per kW, solar panels would make about 1,057 kWh a year here against the turbine's 154, so get a solar quote first.

What would have to change

Against the rest of MT

Lincoln County is the 3,133rd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MT is Fallon County at 6.64 m/s, payback 29 years.

Month by month in Lincoln County

March is the strongest month here, at 2.73 m/s and about 158 kWh. February is the weakest, 2.49 m/s and 101 kWh, so the best month makes 1.6 times the worst. November to March brings in 42% of the year's output in Lincoln County.

MonthWind at 30 mOutputWorth
January2.55 m/s124 kWh$18
February2.49 m/s101 kWh$14
March2.73 m/s158 kWh$22
April2.70 m/s148 kWh$21
May2.65 m/s143 kWh$20
June2.60 m/s129 kWh$18
July2.44 m/s104 kWh$15
August2.43 m/s102 kWh$14
September2.56 m/s122 kWh$17
October2.66 m/s145 kWh$20
November2.68 m/s143 kWh$20
December2.54 m/s121 kWh$17

What a taller tower would buy

Measured at 10 m the wind in Lincoln County averages 1.75 m/s; at 50 m it is 3.1 m/s. That gives a shear exponent of 0.355, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 870 to 2,906 kWh a year, 234% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.24 m/s870 kWhover 100 years
30 m2.59 m/s1,534 kWhover 100 years
40 m2.86 m/s2,216 kWhover 100 years
50 m3.1 m/s2,906 kWhover 100 years

Counties around Lincoln County

3 of the 6 closest counties are windier at turbine height; the windiest, Kootenai County, averages 3.64 m/s.

Sun versus wind in Lincoln County

Lincoln County gets 3.62 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,057 kWh a year; one kW of the turbine above makes 154. Kilowatt for kilowatt, panels make 6.9 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.