Wind Turbine Payback in Socorro County, NM

Wind turbine payback in Socorro County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Socorro County, NM averages 5.09 m/s (11.4 mph). A 10 kW turbine there would make about 13,146 kWh a year, worth $2,017 at NM's 15.34¢/kWh. Against an installed cost of about $100,000, that is a payback of 50 years, and the turbine is built to last about 20.

What to do in Socorro County

A home turbine is not worth buying for savings in Socorro County unless your spot is far windier than the county average, 7.8 m/s at the hub against 5.09 m/s here. Per kW, solar panels would make about 1,664 kWh a year here against the turbine's 1,315, so get a solar quote first.

What would have to change

Against the rest of NM

Socorro County is the 1,408th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NM is Union County at 6.75 m/s, payback 26 years.

Month by month in Socorro County

April is the strongest month here, at 6.32 m/s and about 1,816 kWh. August is the weakest, 3.68 m/s and 433 kWh, so the best month makes 4.2 times the worst. November to March brings in 48% of the year's output in Socorro County.

MonthWind at 30 mOutputWorth
January5.28 m/s1,227 kWh$188
February5.76 m/s1,378 kWh$211
March5.91 m/s1,615 kWh$248
April6.32 m/s1,816 kWh$279
May5.75 m/s1,515 kWh$232
June5.08 m/s1,077 kWh$165
July3.77 m/s466 kWh$71
August3.68 m/s433 kWh$66
September4.33 m/s686 kWh$105
October4.98 m/s1,051 kWh$161
November5.11 m/s1,092 kWh$168
December5.21 m/s1,185 kWh$182

What a taller tower would buy

Measured at 10 m the wind in Socorro County averages 3.92 m/s; at 50 m it is 5.75 m/s. That gives a shear exponent of 0.238, typical of ordinary open country. Going from 20 m to 50 m takes output from 10,091 to 17,859 kWh a year, 77% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.62 m/s10,091 kWh65 years
30 m5.09 m/s13,159 kWh50 years
40 m5.45 m/s15,696 kWh42 years
50 m5.75 m/s17,859 kWh37 years

Counties around Socorro County

3 of the 6 closest counties are windier at turbine height; the windiest, Torrance County, averages 6.4 m/s.

Sun versus wind in Socorro County

Socorro County gets 5.7 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,664 kWh a year; one kW of the turbine above makes 1,315. Kilowatt for kilowatt, panels make 1.3 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.