Wind Turbine Payback in Toole County, MT

Wind turbine payback in Toole County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Toole County, MT averages 6.17 m/s (13.8 mph). A 10 kW turbine there would make about 20,965 kWh a year, worth $2,962 at MT's 14.13¢/kWh. Against an installed cost of about $100,000, that is a payback of 34 years, and the turbine is built to last about 20.

What to do in Toole County

A home turbine is not worth buying for savings in Toole County unless your spot is far windier than the county average, 8.2 m/s at the hub against 6.17 m/s here. Per kW, solar panels would make about 1,142 kWh a year here against the turbine's 2,097, so get a solar quote first.

What would have to change

Against the rest of MT

Toole County is the 608th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MT is Fallon County at 6.64 m/s, payback 29 years.

Month by month in Toole County

January is the strongest month here, at 7.23 m/s and about 2,435 kWh. August is the weakest, 4.97 m/s and 1,045 kWh, so the best month makes 2.3 times the worst. November to March brings in 51% of the year's output in Toole County.

MonthWind at 30 mOutputWorth
January7.23 m/s2,435 kWh$344
February6.52 m/s1,807 kWh$255
March6.56 m/s2,028 kWh$287
April6.23 m/s1,758 kWh$248
May5.81 m/s1,554 kWh$220
June5.66 m/s1,412 kWh$200
July5.22 m/s1,195 kWh$169
August4.97 m/s1,045 kWh$148
September5.44 m/s1,280 kWh$181
October6.48 m/s1,973 kWh$279
November7.01 m/s2,228 kWh$315
December6.87 m/s2,215 kWh$313

What a taller tower would buy

Measured at 10 m the wind in Toole County averages 4.78 m/s; at 50 m it is 6.94 m/s. That gives a shear exponent of 0.232, typical of ordinary open country. Going from 20 m to 50 m takes output from 16,841 to 26,613 kWh a year, 58% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.61 m/s16,841 kWh42 years
30 m6.16 m/s20,923 kWh34 years
40 m6.59 m/s24,068 kWh29 years
50 m6.94 m/s26,613 kWh27 years

Counties around Toole County

2 of the 6 closest counties are windier at turbine height; the windiest, Liberty County, averages 6.21 m/s.

Sun versus wind in Toole County

Toole County gets 3.91 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,142 kWh a year; one kW of the turbine above makes 2,097. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.8 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.