Wind Turbine Payback in Waushara County, WI

Wind turbine payback in Waushara County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Waushara County, WI averages 6.06 m/s (13.6 mph). A 10 kW turbine there would make about 20,149 kWh a year, worth $3,838 at WI's 19.05¢/kWh. Against an installed cost of about $100,000, that is a payback of 26 years, and the turbine is built to last about 20.

What to do in Waushara County

A home turbine is not worth buying for savings in Waushara County unless your spot is far windier than the county average, 6.9 m/s at the hub against 6.06 m/s here. Per kW, solar panels would make about 1,115 kWh a year here against the turbine's 2,015, so get a solar quote first.

What would have to change

Against the rest of WI

Waushara County is the 747th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WI is Manitowoc County at 7.32 m/s, payback 18 years.

Month by month in Waushara County

April is the strongest month here, at 6.83 m/s and about 2,125 kWh. August is the weakest, 4.91 m/s and 1,014 kWh, so the best month makes 2.1 times the worst. November to March brings in 48% of the year's output in Waushara County.

MonthWind at 30 mOutputWorth
January6.58 m/s2,041 kWh$389
February6.74 m/s1,929 kWh$367
March6.49 m/s1,979 kWh$377
April6.83 m/s2,125 kWh$405
May6.09 m/s1,732 kWh$330
June5.44 m/s1,282 kWh$244
July4.97 m/s1,050 kWh$200
August4.91 m/s1,014 kWh$193
September5.72 m/s1,448 kWh$276
October6.39 m/s1,917 kWh$365
November6.38 m/s1,850 kWh$352
December6.32 m/s1,878 kWh$358

What a taller tower would buy

Measured at 10 m the wind in Waushara County averages 4.77 m/s; at 50 m it is 6.78 m/s. That gives a shear exponent of 0.218, typical of ordinary open country. Going from 20 m to 50 m takes output from 16,416 to 25,457 kWh a year, 55% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.55 m/s16,416 kWh32 years
30 m6.07 m/s20,190 kWh26 years
40 m6.46 m/s23,098 kWh23 years
50 m6.78 m/s25,457 kWh21 years

Counties around Waushara County

4 of the 6 closest counties are windier at turbine height; the windiest, Green Lake County, averages 6.12 m/s.

Sun versus wind in Waushara County

Waushara County gets 3.82 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,115 kWh a year; one kW of the turbine above makes 2,015. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.8 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.