Wind turbine payback in Windsor County
No. The turbine wears out before it pays for itself.
At 30 m, the height a home turbine tower usually reaches, the wind in Windsor County, VT averages 3.58 m/s (8 mph). A 10 kW turbine there would make about 4,653 kWh a year, worth $1,113 at VT's 23.93¢/kWh. Against an installed cost of about $100,000, that is a payback of 90 years, and the turbine is built to last about 20.
What to do in Windsor County
A home turbine is not worth buying for savings in Windsor County unless your spot is far windier than the county average, 6.2 m/s at the hub against 3.58 m/s here. Per kW, solar panels would make about 1,069 kWh a year here against the turbine's 465, so get a solar quote first.
What would have to change
- Power would have to cost 107¢/kWh, 4.5 times what VT pays now.
- Or the average wind at the hub would have to be 6.2 m/s instead of 3.58. A taller tower or an exposed ridge can add some of that; a rooftop never will.
Against the rest of VT
Windsor County is the 2,429th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in VT is Franklin County at 3.97 m/s, payback 65 years.
Month by month in Windsor County
February is the strongest month here, at 4.45 m/s and about 695 kWh. August is the weakest, 2.83 m/s and 180 kWh, so the best month makes 3.9 times the worst. November to March brings in 60% of the year's output in Windsor County.
| Month | Wind at 30 m | Output | Worth |
|---|---|---|---|
| January | 4.22 m/s | 657 kWh | $157 |
| February | 4.45 m/s | 695 kWh | $166 |
| March | 4.29 m/s | 691 kWh | $165 |
| April | 3.99 m/s | 535 kWh | $128 |
| May | 3.37 m/s | 324 kWh | $78 |
| June | 3.04 m/s | 223 kWh | $53 |
| July | 2.85 m/s | 185 kWh | $44 |
| August | 2.83 m/s | 180 kWh | $43 |
| September | 3.00 m/s | 213 kWh | $51 |
| October | 3.42 m/s | 342 kWh | $82 |
| November | 3.64 m/s | 403 kWh | $96 |
| December | 3.91 m/s | 522 kWh | $125 |
What a taller tower would buy
Measured at 10 m the wind in Windsor County averages 2.25 m/s; at 50 m it is 4.45 m/s. That gives a shear exponent of 0.424, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 2,653 to 9,041 kWh a year, 241% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.
| Hub height | Average wind | Output | Payback |
|---|---|---|---|
| 20 m | 3.02 m/s | 2,653 kWh | over 100 years |
| 30 m | 3.58 m/s | 4,667 kWh | 90 years |
| 40 m | 4.05 m/s | 6,822 kWh | 61 years |
| 50 m | 4.45 m/s | 9,041 kWh | 46 years |
Counties around Windsor County
1 of the 6 closest counties is windier at turbine height; the windiest, Windham County, averages 3.64 m/s.
- Rutland County, VT: 3.32 m/s, 3,648 kWh, payback over 100 years (23 mi)
- Sullivan County, NH: 3.58 m/s, 4,653 kWh, payback 80 years (24 mi)
- Orange County, VT: 3.55 m/s, 4,530 kWh, payback 92 years (32 mi)
- Windham County, VT: 3.64 m/s, 4,905 kWh, payback 85 years (40 mi)
- Addison County, VT: 3.43 m/s, 4,056 kWh, payback over 100 years (42 mi)
- Grafton County, NH: 3.51 m/s, 4,368 kWh, payback 85 years (45 mi)
Sun versus wind in Windsor County
Windsor County gets 3.66 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,069 kWh a year; one kW of the turbine above makes 465. Kilowatt for kilowatt, panels make 2.3 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.
How this is worked out
Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.