TurbinePayback

Wind Turbine Payback in Bennett County, SD

Wind turbine payback in Bennett County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Bennett County, SD averages 6.73 m/s (15.1 mph). A 10 kW turbine there would make about 25,093 kWh a year, worth $3,659 at SD's 14.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 27 years, and the turbine is built to last about 20.

What to do in Bennett County

A home turbine is not worth buying for savings in Bennett County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.73 m/s here. Per kW, solar panels would make about 1,261 kWh a year here against the turbine's 2,509, so get a solar quote first.

What would have to change

Against the rest of SD

Bennett County is the 46th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in SD is Todd County at 6.77 m/s, payback 27 years.

Month by month in Bennett County

January is the strongest month here, at 7.40 m/s and about 2,536 kWh. July is the weakest, 5.75 m/s and 1,514 kWh, so the best month makes 1.7 times the worst. November to March brings in 47% of the year's output in Bennett County.

MonthWind at 30 mOutputWorth
January7.40 m/s2,536 kWh$370
February7.00 m/s2,072 kWh$302
March7.01 m/s2,305 kWh$336
April7.09 m/s2,273 kWh$331
May6.57 m/s2,034 kWh$297
June6.12 m/s1,695 kWh$247
July5.75 m/s1,514 kWh$221
August5.87 m/s1,593 kWh$232
September6.46 m/s1,897 kWh$277
October6.98 m/s2,283 kWh$333
November7.22 m/s2,351 kWh$343
December7.31 m/s2,483 kWh$362

What a taller tower would buy

Measured at 10 m the wind in Bennett County averages 5.35 m/s; at 50 m it is 7.48 m/s. That gives a shear exponent of 0.208, typical of ordinary open country. Going from 20 m to 50 m takes output from 21,054 to 30,400 kWh a year, 44% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6.18 m/s21,054 kWh33 years
30 m6.73 m/s25,064 kWh27 years
40 m7.14 m/s28,043 kWh25 years
50 m7.48 m/s30,400 kWh23 years

Counties around Bennett County

2 of the 6 closest counties are windier at turbine height; the windiest, Cherry County, averages 6.83 m/s.

Sun versus wind in Bennett County

Bennett County gets 4.32 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,261 kWh a year; one kW of the turbine above makes 2,509. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.