TurbinePayback

Wind Turbine Payback in Stark County, ND

Wind turbine payback in Stark County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Stark County, ND averages 6.7 m/s (15 mph). A 10 kW turbine there would make about 24,874 kWh a year, worth $3,099 at ND's 12.46¢/kWh. Against an installed cost of about $100,000, that is a payback of 32 years, and the turbine is built to last about 20.

What to do in Stark County

A home turbine is not worth buying for savings in Stark County unless your spot is far windier than the county average, 9.1 m/s at the hub against 6.7 m/s here. Per kW, solar panels would make about 1,194 kWh a year here against the turbine's 2,487, so get a solar quote first.

What would have to change

Against the rest of ND

Stark County is the 62nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ND is Bowman County at 6.79 m/s, payback 31 years.

Month by month in Stark County

January is the strongest month here, at 7.22 m/s and about 2,430 kWh. July is the weakest, 5.83 m/s and 1,568 kWh, so the best month makes 1.5 times the worst. November to March brings in 45% of the year's output in Stark County.

MonthWind at 30 mOutputWorth
January7.22 m/s2,430 kWh$303
February6.58 m/s1,841 kWh$229
March6.95 m/s2,267 kWh$282
April6.91 m/s2,167 kWh$270
May6.65 m/s2,083 kWh$260
June6.24 m/s1,765 kWh$220
July5.83 m/s1,568 kWh$195
August5.94 m/s1,636 kWh$204
September6.58 m/s1,973 kWh$246
October7.18 m/s2,408 kWh$300
November7.18 m/s2,331 kWh$290
December7.07 m/s2,338 kWh$291

What a taller tower would buy

Measured at 10 m the wind in Stark County averages 5.36 m/s; at 50 m it is 7.43 m/s. That gives a shear exponent of 0.203, typical of ordinary open country. Going from 20 m to 50 m takes output from 20,957 to 30,058 kWh a year, 43% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6.17 m/s20,957 kWh38 years
30 m6.7 m/s24,861 kWh32 years
40 m7.1 m/s27,762 kWh29 years
50 m7.43 m/s30,058 kWh27 years

Counties around Stark County

4 of the 6 closest counties are windier at turbine height; the windiest, Hettinger County, averages 6.78 m/s.

Sun versus wind in Stark County

Stark County gets 4.09 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,194 kWh a year; one kW of the turbine above makes 2,487. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.1 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.