Wind Turbine Payback in Boundary County, ID

Wind turbine payback in Boundary County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Boundary County, ID averages 2.41 m/s (5.4 mph). A 10 kW turbine there would make about 1,172 kWh a year, worth $153 at ID's 13.02¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Boundary County

A home turbine is not worth buying for savings in Boundary County unless your spot is far windier than the county average, 8.7 m/s at the hub against 2.41 m/s here. Per kW, solar panels would make about 1,063 kWh a year here against the turbine's 117, so get a solar quote first.

What would have to change

Against the rest of ID

Boundary County is the 3,142nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ID is Owyhee County at 5.38 m/s, payback 51 years.

Month by month in Boundary County

May is the strongest month here, at 2.54 m/s and about 122 kWh. August is the weakest, 2.27 m/s and 78 kWh, so the best month makes 1.6 times the worst. November to March brings in 40% of the year's output in Boundary County.

MonthWind at 30 mOutputWorth
January2.33 m/s87 kWh$11
February2.35 m/s81 kWh$11
March2.49 m/s113 kWh$15
April2.46 m/s105 kWh$14
May2.54 m/s122 kWh$16
June2.50 m/s110 kWh$14
July2.33 m/s87 kWh$11
August2.27 m/s78 kWh$10
September2.41 m/s97 kWh$13
October2.50 m/s114 kWh$15
November2.49 m/s109 kWh$14
December2.34 m/s88 kWh$11

What a taller tower would buy

Measured at 10 m the wind in Boundary County averages 1.66 m/s; at 50 m it is 2.87 m/s. That gives a shear exponent of 0.340, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 661 to 2,232 kWh a year, 238% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.1 m/s661 kWhover 100 years
30 m2.41 m/s1,177 kWhover 100 years
40 m2.66 m/s1,703 kWhover 100 years
50 m2.87 m/s2,232 kWhover 100 years

Counties around Boundary County

6 of the 6 closest counties are windier at turbine height; the windiest, Spokane County, averages 4.42 m/s.

Sun versus wind in Boundary County

Boundary County gets 3.64 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,063 kWh a year; one kW of the turbine above makes 117. Kilowatt for kilowatt, panels make 9.1 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.