TurbinePayback

Wind Turbine Payback in Emmons County, ND

Wind turbine payback in Emmons County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Emmons County, ND averages 6.53 m/s (14.6 mph). A 10 kW turbine there would make about 23,628 kWh a year, worth $2,944 at ND's 12.46¢/kWh. Against an installed cost of about $100,000, that is a payback of 34 years, and the turbine is built to last about 20.

What to do in Emmons County

A home turbine is not worth buying for savings in Emmons County unless your spot is far windier than the county average, 9.1 m/s at the hub against 6.53 m/s here. Per kW, solar panels would make about 1,177 kWh a year here against the turbine's 2,363, so get a solar quote first.

What would have to change

Against the rest of ND

Emmons County is the 165th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ND is Bowman County at 6.79 m/s, payback 31 years.

Month by month in Emmons County

October is the strongest month here, at 7.07 m/s and about 2,337 kWh. July is the weakest, 5.74 m/s and 1,512 kWh, so the best month makes 1.5 times the worst. November to March brings in 42% of the year's output in Emmons County.

MonthWind at 30 mOutputWorth
January6.63 m/s2,072 kWh$258
February6.35 m/s1,708 kWh$213
March6.78 m/s2,161 kWh$269
April6.98 m/s2,209 kWh$275
May6.83 m/s2,194 kWh$273
June6.24 m/s1,764 kWh$220
July5.74 m/s1,512 kWh$188
August5.88 m/s1,597 kWh$199
September6.63 m/s2,005 kWh$250
October7.07 m/s2,337 kWh$291
November6.76 m/s2,080 kWh$259
December6.56 m/s2,027 kWh$253

What a taller tower would buy

Measured at 10 m the wind in Emmons County averages 5.21 m/s; at 50 m it is 7.26 m/s. That gives a shear exponent of 0.206, typical of ordinary open country. Going from 20 m to 50 m takes output from 19,787 to 28,881 kWh a year, 46% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6.01 m/s19,787 kWh41 years
30 m6.53 m/s23,664 kWh34 years
40 m6.93 m/s26,569 kWh30 years
50 m7.26 m/s28,881 kWh28 years

Counties around Emmons County

4 of the 6 closest counties are windier at turbine height; the windiest, Logan County, averages 6.69 m/s.

Sun versus wind in Emmons County

Emmons County gets 4.03 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,177 kWh a year; one kW of the turbine above makes 2,363. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.