No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in McIntosh County, ND averages 6.65 m/s (14.9 mph). A 10 kW turbine there would make about 24,509 kWh a year, worth $3,054 at ND's 12.46¢/kWh. Against an installed cost of about $100,000, that is a payback of 33 years, and the turbine is built to last about 20.

What to do in McIntosh County

A home turbine is not worth buying for savings in McIntosh County unless your spot is far windier than the county average, 9.1 m/s at the hub against 6.65 m/s here. Per kW, solar panels would make about 1,171 kWh a year here against the turbine's 2,451, so get a solar quote first.

What would have to change

Against the rest of ND

McIntosh County is the 92nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ND is Bowman County at 6.79 m/s, payback 31 years.

Month by month in McIntosh County

October is the strongest month here, at 7.20 m/s and about 2,415 kWh. July is the weakest, 5.76 m/s and 1,525 kWh, so the best month makes 1.6 times the worst. November to March brings in 43% of the year's output in McIntosh County.

MonthWind at 30 mOutputWorth
January6.82 m/s2,185 kWh$272
February6.57 m/s1,832 kWh$228
March6.84 m/s2,202 kWh$274
April7.11 m/s2,284 kWh$285
May6.93 m/s2,257 kWh$281
June6.30 m/s1,799 kWh$224
July5.76 m/s1,525 kWh$190
August5.86 m/s1,587 kWh$198
September6.73 m/s2,061 kWh$257
October7.20 m/s2,415 kWh$301
November6.91 m/s2,168 kWh$270
December6.75 m/s2,146 kWh$267

What a taller tower would buy

Measured at 10 m the wind in McIntosh County averages 5.31 m/s; at 50 m it is 7.38 m/s. That gives a shear exponent of 0.205, typical of ordinary open country. Going from 20 m to 50 m takes output from 20,565 to 29,714 kWh a year, 44% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6.12 m/s20,565 kWh39 years
30 m6.65 m/s24,481 kWh33 years
40 m7.05 m/s27,400 kWh29 years
50 m7.38 m/s29,714 kWh27 years

Counties around McIntosh County

1 of the 6 closest counties is windier at turbine height; the windiest, Logan County, averages 6.69 m/s.

Sun versus wind in McIntosh County

McIntosh County gets 4.01 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,171 kWh a year; one kW of the turbine above makes 2,451. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.1 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.