Wind turbine payback in Campbell County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Campbell County, WY averages 6.03 m/s (13.5 mph). A 10 kW turbine there would make about 19,926 kWh a year, worth $2,792 at WY's 14.01¢/kWh. Against an installed cost of about $100,000, that is a payback of 36 years, and the turbine is built to last about 20.

What to do in Campbell County

A home turbine is not worth buying for savings in Campbell County unless your spot is far windier than the county average, 8.3 m/s at the hub against 6.03 m/s here. Per kW, solar panels would make about 1,253 kWh a year here against the turbine's 1,993, so get a solar quote first.

What would have to change

Against the rest of WY

Campbell County is the 791st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WY is Albany County at 7.32 m/s, payback 24 years.

Month by month in Campbell County

January is the strongest month here, at 6.80 m/s and about 2,172 kWh. July is the weakest, 5.14 m/s and 1,143 kWh, so the best month makes 1.9 times the worst. November to March brings in 49% of the year's output in Campbell County.

MonthWind at 30 mOutputWorth
January6.80 m/s2,172 kWh$304
February6.38 m/s1,730 kWh$242
March6.33 m/s1,881 kWh$264
April6.16 m/s1,716 kWh$240
May5.81 m/s1,554 kWh$218
June5.40 m/s1,257 kWh$176
July5.14 m/s1,143 kWh$160
August5.24 m/s1,207 kWh$169
September5.65 m/s1,406 kWh$197
October6.24 m/s1,825 kWh$256
November6.47 m/s1,908 kWh$267
December6.69 m/s2,106 kWh$295

What a taller tower would buy

Measured at 10 m the wind in Campbell County averages 4.78 m/s; at 50 m it is 6.71 m/s. That gives a shear exponent of 0.211, typical of ordinary open country. Going from 20 m to 50 m takes output from 16,257 to 24,947 kWh a year, 53% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.53 m/s16,257 kWh44 years
30 m6.02 m/s19,885 kWh36 years
40 m6.4 m/s22,679 kWh32 years
50 m6.71 m/s24,947 kWh29 years

Counties around Campbell County

2 of the 6 closest counties are windier at turbine height; the windiest, Converse County, averages 6.97 m/s.

Sun versus wind in Campbell County

Campbell County gets 4.29 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,253 kWh a year; one kW of the turbine above makes 1,993. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.6 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.