TurbinePayback

Wind Turbine Payback in Weston County, WY

Wind turbine payback in Weston County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Weston County, WY averages 5.46 m/s (12.2 mph). A 10 kW turbine there would make about 15,749 kWh a year, worth $2,206 at WY's 14.01¢/kWh. Against an installed cost of about $100,000, that is a payback of 45 years, and the turbine is built to last about 20.

What to do in Weston County

A home turbine is not worth buying for savings in Weston County unless your spot is far windier than the county average, 8.3 m/s at the hub against 5.46 m/s here. Per kW, solar panels would make about 1,296 kWh a year here against the turbine's 1,575, so get a solar quote first.

What would have to change

Against the rest of WY

Weston County is the 1,245th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WY is Albany County at 7.32 m/s, payback 24 years.

Month by month in Weston County

January is the strongest month here, at 5.82 m/s and about 1,559 kWh. July is the weakest, 4.84 m/s and 976 kWh, so the best month makes 1.6 times the worst. November to March brings in 45% of the year's output in Weston County.

MonthWind at 30 mOutputWorth
January5.82 m/s1,559 kWh$218
February5.69 m/s1,338 kWh$187
March5.76 m/s1,526 kWh$214
April5.81 m/s1,504 kWh$211
May5.57 m/s1,405 kWh$197
June5.19 m/s1,136 kWh$159
July4.84 m/s976 kWh$137
August4.93 m/s1,025 kWh$144
September5.16 m/s1,121 kWh$157
October5.64 m/s1,449 kWh$203
November5.50 m/s1,317 kWh$185
December5.64 m/s1,449 kWh$203

What a taller tower would buy

Measured at 10 m the wind in Weston County averages 4.22 m/s; at 50 m it is 6.16 m/s. That gives a shear exponent of 0.235, typical of ordinary open country. Going from 20 m to 50 m takes output from 12,310 to 20,891 kWh a year, 70% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.97 m/s12,310 kWh58 years
30 m5.46 m/s15,772 kWh45 years
40 m5.85 m/s18,560 kWh39 years
50 m6.16 m/s20,891 kWh34 years

Counties around Weston County

5 of the 6 closest counties are windier at turbine height; the windiest, Niobrara County, averages 6.56 m/s.

Sun versus wind in Weston County

Weston County gets 4.44 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,296 kWh a year; one kW of the turbine above makes 1,575. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.2 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.