Wind turbine payback in Cavalier County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Cavalier County, ND averages 6.57 m/s (14.7 mph). A 10 kW turbine there would make about 23,922 kWh a year, worth $2,981 at ND's 12.46¢/kWh. Against an installed cost of about $100,000, that is a payback of 34 years, and the turbine is built to last about 20.

What to do in Cavalier County

A home turbine is not worth buying for savings in Cavalier County unless your spot is far windier than the county average, 9.1 m/s at the hub against 6.57 m/s here. Per kW, solar panels would make about 1,130 kWh a year here against the turbine's 2,392, so get a solar quote first.

What would have to change

Against the rest of ND

Cavalier County is the 130th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ND is Bowman County at 6.79 m/s, payback 31 years.

Month by month in Cavalier County

October is the strongest month here, at 7.03 m/s and about 2,314 kWh. July is the weakest, 5.72 m/s and 1,499 kWh, so the best month makes 1.5 times the worst. November to March brings in 44% of the year's output in Cavalier County.

MonthWind at 30 mOutputWorth
January6.86 m/s2,209 kWh$275
February6.60 m/s1,850 kWh$231
March6.83 m/s2,193 kWh$273
April6.93 m/s2,181 kWh$272
May6.78 m/s2,159 kWh$269
June6.20 m/s1,741 kWh$217
July5.72 m/s1,499 kWh$187
August5.86 m/s1,584 kWh$197
September6.51 m/s1,933 kWh$241
October7.03 m/s2,314 kWh$288
November6.93 m/s2,181 kWh$272
December6.59 m/s2,042 kWh$254

What a taller tower would buy

Measured at 10 m the wind in Cavalier County averages 5.25 m/s; at 50 m it is 7.29 m/s. That gives a shear exponent of 0.204, typical of ordinary open country. Going from 20 m to 50 m takes output from 20,053 to 29,090 kWh a year, 45% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6.05 m/s20,053 kWh40 years
30 m6.57 m/s23,912 kWh34 years
40 m6.97 m/s26,797 kWh30 years
50 m7.29 m/s29,090 kWh28 years

Counties around Cavalier County

None of the 6 closest counties is windier than Cavalier County.

Sun versus wind in Cavalier County

Cavalier County gets 3.87 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,130 kWh a year; one kW of the turbine above makes 2,392. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.1 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.