TurbinePayback

Wind Turbine Payback in Grant County, ND

Wind turbine payback in Grant County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Grant County, ND averages 6.67 m/s (14.9 mph). A 10 kW turbine there would make about 24,655 kWh a year, worth $3,072 at ND's 12.46¢/kWh. Against an installed cost of about $100,000, that is a payback of 33 years, and the turbine is built to last about 20.

What to do in Grant County

A home turbine is not worth buying for savings in Grant County unless your spot is far windier than the county average, 9.1 m/s at the hub against 6.67 m/s here. Per kW, solar panels would make about 1,177 kWh a year here against the turbine's 2,466, so get a solar quote first.

What would have to change

Against the rest of ND

Grant County is the 82nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ND is Bowman County at 6.79 m/s, payback 31 years.

Month by month in Grant County

January is the strongest month here, at 7.18 m/s and about 2,404 kWh. July is the weakest, 5.78 m/s and 1,537 kWh, so the best month makes 1.6 times the worst. November to March brings in 45% of the year's output in Grant County.

MonthWind at 30 mOutputWorth
January7.18 m/s2,404 kWh$300
February6.59 m/s1,848 kWh$230
March6.94 m/s2,262 kWh$282
April6.93 m/s2,184 kWh$272
May6.66 m/s2,090 kWh$260
June6.19 m/s1,733 kWh$216
July5.78 m/s1,537 kWh$192
August5.92 m/s1,621 kWh$202
September6.57 m/s1,969 kWh$245
October7.17 m/s2,398 kWh$299
November7.08 m/s2,269 kWh$283
December7.02 m/s2,312 kWh$288

What a taller tower would buy

Measured at 10 m the wind in Grant County averages 5.33 m/s; at 50 m it is 7.41 m/s. That gives a shear exponent of 0.205, typical of ordinary open country. Going from 20 m to 50 m takes output from 20,750 to 29,920 kWh a year, 44% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6.14 m/s20,750 kWh39 years
30 m6.67 m/s24,679 kWh33 years
40 m7.08 m/s27,604 kWh29 years
50 m7.41 m/s29,920 kWh27 years

Counties around Grant County

2 of the 6 closest counties are windier at turbine height; the windiest, Hettinger County, averages 6.78 m/s.

Sun versus wind in Grant County

Grant County gets 4.03 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,177 kWh a year; one kW of the turbine above makes 2,466. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.1 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.