TurbinePayback

Wind Turbine Payback in Greene County, IA

Wind turbine payback in Greene County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Greene County, IA averages 6.31 m/s (14.1 mph). A 10 kW turbine there would make about 22,003 kWh a year, worth $3,201 at IA's 14.55¢/kWh. Against an installed cost of about $100,000, that is a payback of 31 years, and the turbine is built to last about 20.

What to do in Greene County

A home turbine is not worth buying for savings in Greene County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.31 m/s here. Per kW, solar panels would make about 1,186 kWh a year here against the turbine's 2,200, so get a solar quote first.

What would have to change

Against the rest of IA

Greene County is the 460th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in IA is Dickinson County at 6.59 m/s, payback 29 years.

Month by month in Greene County

April is the strongest month here, at 7.17 m/s and about 2,323 kWh. August is the weakest, 5.06 m/s and 1,100 kWh, so the best month makes 2.1 times the worst. November to March brings in 47% of the year's output in Greene County.

MonthWind at 30 mOutputWorth
January6.72 m/s2,122 kWh$309
February6.69 m/s1,902 kWh$277
March6.83 m/s2,194 kWh$319
April7.17 m/s2,323 kWh$338
May6.52 m/s2,000 kWh$291
June5.79 m/s1,489 kWh$217
July5.07 m/s1,105 kWh$161
August5.06 m/s1,100 kWh$160
September6.03 m/s1,636 kWh$238
October6.57 m/s2,033 kWh$296
November6.77 m/s2,086 kWh$304
December6.58 m/s2,039 kWh$297

What a taller tower would buy

Measured at 10 m the wind in Greene County averages 4.96 m/s; at 50 m it is 7.06 m/s. That gives a shear exponent of 0.219, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,052 to 27,471 kWh a year, 52% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.78 m/s18,052 kWh38 years
30 m6.31 m/s22,023 kWh31 years
40 m6.72 m/s25,044 kWh27 years
50 m7.06 m/s27,471 kWh25 years

Counties around Greene County

3 of the 6 closest counties are windier at turbine height; the windiest, Carroll County, averages 6.42 m/s.

Sun versus wind in Greene County

Greene County gets 4.06 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,186 kWh a year; one kW of the turbine above makes 2,200. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.