TurbinePayback

Wind Turbine Payback in Itasca County, MN

Wind turbine payback in Itasca County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Itasca County, MN averages 5.88 m/s (13.2 mph). A 10 kW turbine there would make about 18,816 kWh a year, worth $3,093 at MN's 16.44¢/kWh. Against an installed cost of about $100,000, that is a payback of 32 years, and the turbine is built to last about 20.

What to do in Itasca County

A home turbine is not worth buying for savings in Itasca County unless your spot is far windier than the county average, 7.5 m/s at the hub against 5.88 m/s here. Per kW, solar panels would make about 1,045 kWh a year here against the turbine's 1,882, so get a solar quote first.

What would have to change

Against the rest of MN

Itasca County is the 1,013th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MN is Lincoln County at 6.68 m/s, payback 25 years.

Month by month in Itasca County

April is the strongest month here, at 6.28 m/s and about 1,792 kWh. July is the weakest, 5.31 m/s and 1,245 kWh, so the best month makes 1.4 times the worst. November to March brings in 43% of the year's output in Itasca County.

MonthWind at 30 mOutputWorth
January5.95 m/s1,643 kWh$270
February6.08 m/s1,556 kWh$256
March6.04 m/s1,700 kWh$279
April6.28 m/s1,792 kWh$295
May5.93 m/s1,627 kWh$267
June5.64 m/s1,401 kWh$230
July5.31 m/s1,245 kWh$205
August5.41 m/s1,305 kWh$215
September6.04 m/s1,645 kWh$270
October6.14 m/s1,762 kWh$290
November6.01 m/s1,629 kWh$268
December5.74 m/s1,509 kWh$248

What a taller tower would buy

Measured at 10 m the wind in Itasca County averages 4.63 m/s; at 50 m it is 6.57 m/s. That gives a shear exponent of 0.217, typical of ordinary open country. Going from 20 m to 50 m takes output from 15,214 to 23,922 kWh a year, 57% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.39 m/s15,214 kWh40 years
30 m5.88 m/s18,821 kWh32 years
40 m6.26 m/s21,628 kWh28 years
50 m6.57 m/s23,922 kWh25 years

Counties around Itasca County

4 of the 6 closest counties are windier at turbine height; the windiest, Hubbard County, averages 6.51 m/s.

Sun versus wind in Itasca County

Itasca County gets 3.58 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,045 kWh a year; one kW of the turbine above makes 1,882. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.8 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.