Wind Turbine Payback in Aitkin County, MN

Wind turbine payback in Aitkin County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Aitkin County, MN averages 6.32 m/s (14.1 mph). A 10 kW turbine there would make about 22,077 kWh a year, worth $3,629 at MN's 16.44¢/kWh. Against an installed cost of about $100,000, that is a payback of 28 years, and the turbine is built to last about 20.

What to do in Aitkin County

A home turbine is not worth buying for savings in Aitkin County unless your spot is far windier than the county average, 7.5 m/s at the hub against 6.32 m/s here. Per kW, solar panels would make about 1,080 kWh a year here against the turbine's 2,208, so get a solar quote first.

What would have to change

Against the rest of MN

Aitkin County is the 452nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MN is Lincoln County at 6.68 m/s, payback 25 years.

Month by month in Aitkin County

April is the strongest month here, at 6.83 m/s and about 2,125 kWh. July is the weakest, 5.48 m/s and 1,350 kWh, so the best month makes 1.6 times the worst. November to March brings in 44% of the year's output in Aitkin County.

MonthWind at 30 mOutputWorth
January6.58 m/s2,040 kWh$335
February6.71 m/s1,913 kWh$314
March6.52 m/s2,001 kWh$329
April6.83 m/s2,125 kWh$349
May6.34 m/s1,888 kWh$310
June5.95 m/s1,587 kWh$261
July5.48 m/s1,350 kWh$222
August5.63 m/s1,444 kWh$237
September6.41 m/s1,871 kWh$308
October6.66 m/s2,085 kWh$343
November6.50 m/s1,925 kWh$316
December6.25 m/s1,832 kWh$301

What a taller tower would buy

Measured at 10 m the wind in Aitkin County averages 5 m/s; at 50 m it is 7.04 m/s. That gives a shear exponent of 0.213, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,166 to 27,328 kWh a year, 50% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.79 m/s18,166 kWh34 years
30 m6.31 m/s22,034 kWh28 years
40 m6.71 m/s24,971 kWh24 years
50 m7.04 m/s27,328 kWh22 years

Counties around Aitkin County

2 of the 6 closest counties are windier at turbine height; the windiest, Crow Wing County, averages 6.41 m/s.

Sun versus wind in Aitkin County

Aitkin County gets 3.7 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,080 kWh a year; one kW of the turbine above makes 2,208. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.