Wind Turbine Payback in Torrance County, NM

Wind turbine payback in Torrance County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Torrance County, NM averages 6.4 m/s (14.3 mph). A 10 kW turbine there would make about 22,669 kWh a year, worth $3,477 at NM's 15.34¢/kWh. Against an installed cost of about $100,000, that is a payback of 29 years, and the turbine is built to last about 20.

What to do in Torrance County

A home turbine is not worth buying for savings in Torrance County unless your spot is far windier than the county average, 7.8 m/s at the hub against 6.4 m/s here. Per kW, solar panels would make about 1,629 kWh a year here against the turbine's 2,267, so get a solar quote first.

What would have to change

Against the rest of NM

Torrance County is the 322nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NM is Union County at 6.75 m/s, payback 26 years.

Month by month in Torrance County

April is the strongest month here, at 7.59 m/s and about 2,560 kWh. August is the weakest, 4.46 m/s and 775 kWh, so the best month makes 3.3 times the worst. November to March brings in 52% of the year's output in Torrance County.

MonthWind at 30 mOutputWorth
January7.25 m/s2,448 kWh$376
February7.46 m/s2,320 kWh$356
March7.29 m/s2,470 kWh$379
April7.59 m/s2,560 kWh$393
May6.69 m/s2,107 kWh$323
June5.82 m/s1,509 kWh$231
July4.52 m/s802 kWh$123
August4.46 m/s775 kWh$119
September5.31 m/s1,207 kWh$185
October6.29 m/s1,856 kWh$285
November6.94 m/s2,188 kWh$336
December7.27 m/s2,459 kWh$377

What a taller tower would buy

Measured at 10 m the wind in Torrance County averages 4.99 m/s; at 50 m it is 7.18 m/s. That gives a shear exponent of 0.226, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,499 to 28,320 kWh a year, 53% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.84 m/s18,499 kWh35 years
30 m6.4 m/s22,648 kWh29 years
40 m6.83 m/s25,797 kWh25 years
50 m7.18 m/s28,320 kWh23 years

Counties around Torrance County

None of the 6 closest counties is windier than Torrance County.

Sun versus wind in Torrance County

Torrance County gets 5.58 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,629 kWh a year; one kW of the turbine above makes 2,267. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.4 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.