TurbinePayback

Wind Turbine Payback in Valencia County, NM

Wind turbine payback in Valencia County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Valencia County, NM averages 4.65 m/s (10.4 mph). A 10 kW turbine there would make about 10,257 kWh a year, worth $1,573 at NM's 15.34¢/kWh. Against an installed cost of about $100,000, that is a payback of 64 years, and the turbine is built to last about 20.

What to do in Valencia County

A home turbine is not worth buying for savings in Valencia County unless your spot is far windier than the county average, 7.8 m/s at the hub against 4.65 m/s here. Per kW, solar panels would make about 1,653 kWh a year here against the turbine's 1,026, so get a solar quote first.

What would have to change

Against the rest of NM

Valencia County is the 1,659th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NM is Union County at 6.75 m/s, payback 26 years.

Month by month in Valencia County

April is the strongest month here, at 5.84 m/s and about 1,521 kWh. August is the weakest, 3.57 m/s and 391 kWh, so the best month makes 3.9 times the worst. November to March brings in 44% of the year's output in Valencia County.

MonthWind at 30 mOutputWorth
January4.49 m/s787 kWh$121
February5.13 m/s1,031 kWh$158
March5.36 m/s1,278 kWh$196
April5.84 m/s1,521 kWh$233
May5.33 m/s1,262 kWh$194
June4.79 m/s915 kWh$140
July3.73 m/s449 kWh$69
August3.57 m/s391 kWh$60
September4.16 m/s609 kWh$93
October4.50 m/s791 kWh$121
November4.49 m/s761 kWh$117
December4.43 m/s760 kWh$117

What a taller tower would buy

Measured at 10 m the wind in Valencia County averages 3.56 m/s; at 50 m it is 5.26 m/s. That gives a shear exponent of 0.243, typical of ordinary open country. Going from 20 m to 50 m takes output from 7,678 to 14,327 kWh a year, 87% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.21 m/s7,678 kWh85 years
30 m4.65 m/s10,232 kWh64 years
40 m4.98 m/s12,416 kWh53 years
50 m5.26 m/s14,327 kWh46 years

Counties around Valencia County

4 of the 6 closest counties are windier at turbine height; the windiest, Torrance County, averages 6.4 m/s.

Sun versus wind in Valencia County

Valencia County gets 5.66 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,653 kWh a year; one kW of the turbine above makes 1,026. Kilowatt for kilowatt, panels make 1.6 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.