TurbinePayback

Wind Turbine Payback in Crow Wing County, MN

Wind turbine payback in Crow Wing County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Crow Wing County, MN averages 6.41 m/s (14.3 mph). A 10 kW turbine there would make about 22,743 kWh a year, worth $3,739 at MN's 16.44¢/kWh. Against an installed cost of about $100,000, that is a payback of 27 years, and the turbine is built to last about 20.

What to do in Crow Wing County

A home turbine is not worth buying for savings in Crow Wing County unless your spot is far windier than the county average, 7.5 m/s at the hub against 6.41 m/s here. Per kW, solar panels would make about 1,101 kWh a year here against the turbine's 2,274, so get a solar quote first.

What would have to change

Against the rest of MN

Crow Wing County is the 309th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MN is Lincoln County at 6.68 m/s, payback 25 years.

Month by month in Crow Wing County

April is the strongest month here, at 6.98 m/s and about 2,209 kWh. July is the weakest, 5.54 m/s and 1,390 kWh, so the best month makes 1.6 times the worst. November to March brings in 44% of the year's output in Crow Wing County.

MonthWind at 30 mOutputWorth
January6.62 m/s2,060 kWh$339
February6.71 m/s1,916 kWh$315
March6.64 m/s2,077 kWh$341
April6.98 m/s2,209 kWh$363
May6.56 m/s2,027 kWh$333
June6.03 m/s1,638 kWh$269
July5.54 m/s1,390 kWh$229
August5.68 m/s1,473 kWh$242
September6.53 m/s1,945 kWh$320
October6.78 m/s2,161 kWh$355
November6.59 m/s1,978 kWh$325
December6.33 m/s1,880 kWh$309

What a taller tower would buy

Measured at 10 m the wind in Crow Wing County averages 5.11 m/s; at 50 m it is 7.12 m/s. That gives a shear exponent of 0.206, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,929 to 27,897 kWh a year, 47% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.9 m/s18,929 kWh32 years
30 m6.41 m/s22,734 kWh27 years
40 m6.8 m/s25,603 kWh24 years
50 m7.12 m/s27,897 kWh22 years

Counties around Crow Wing County

2 of the 6 closest counties are windier at turbine height; the windiest, Wadena County, averages 6.45 m/s.

Sun versus wind in Crow Wing County

Crow Wing County gets 3.77 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,101 kWh a year; one kW of the turbine above makes 2,274. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.1 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.